Laserfiche WebLink
STAGING AREA -36.0 acres within the permit boundary is designated as a staging area and is also <br />designated Phase I Several activities ancillary to the mining operation occur wAhm the graveled surfaced area <br />The dominate use m the staging area rs the stockpiling of raw and processed resource, In additbn to asphalt <br />and concrete production plants. the following activities may occur within the staging area: <br />^ Truck Scale <br />^ Portable Office <br />^ Fuel Storage. <br />^ Equipment Parking and Maintenance. <br />^ Resource Stockpiling <br />^ lab and Tool Trailer Parking <br />^ Seasonal Watchman's Residence (self contained RV). <br />Ofliee trailer and truck scale near the <br />asphalt plant when R a present on site Also, portable diesel fuel tan <br />unit. wash plant, and concrete plan) All fuel is stored in above <br />spill Anolhe <br />of more than <br />of PuDlx: Hes <br />RECEIVED <br />DEC 2 22003 <br />Oidann al Mlnad~ rind Genlopl <br />During a routine inspectbn o1 the faalRy an underground oil storage tank was identified near the north boundary <br />line for Phase I and Staging Area and is depicted on Sheet 2 0l Erdr~bit'C' This tank pre-dates the mining <br />operation and was most likely used a5 a storage vessel for heating od The tank will be decommissbned prior <br />to the end of the last quarter of 2003 The following protocol will be mplemented for tfie removal of the tank <br />Step 1. The product will be pumped from the tank whAe in place by a licensed oil recycler <br />Step 2. The tank wdl then be excavated. <br />Step 3. Any product not removed from the tank during pumping will be drained into a suRable <br />container and disposed of m conjunction wdh other used oil products generated on the site. <br />Step 4 Once the lank rs completely drained R wdl then be crushed using tracked egwpment <br />Step 5. The tank will be disposed o1 at a steel re-cycling facility or an approved land fill <br />