Laserfiche WebLink
~. <br />~DIVISION OF MINERALS AND GEOLOGY <br />Dcparlmenl of NaWral Resourres <br />141 J Sherman SL, Ronm ? 15 <br />Dcnvcr. Colorado HI120J <br />Phonc: 13031 H66-J.567 <br />FA%: 13031 H1?-H I OG <br />VIA FACSIMILE, <br />October 10, 1997 <br />Mr. John Miner <br />Denver East Machinery Company <br />15507 East 18th Ave. <br />Aurora, CO 80011 <br />RE: Adequacy Review, Gold Hill Mill, File No. M-94-117 <br />Technical Revision TR-002, Hazel A Bulkhead Repair <br />Dear Mr. Miner: <br />Roy Rnmrr <br />Gn~ernnr <br />dames 5. Lochhead <br />[\rl UIIYY DIIYIInr <br />Mic hacl 8. Lung <br />Dlvls lon Dlrecior <br />This is in response to your letter of October 7, 1997, regarding <br />Technical Revision TR-002. <br />Item 2. Your response is adequate. <br />Item 3. Your response letter references a bond in place for <br />removing the wooden bulkhead. The reclamation tasks, <br />outlined in a letter to the Division from COM, Inc.dated <br />June 1, 1995, do not include itemized costs for Hazel A <br />bulkhead demolition. These are itemized below based on <br />the dimensions you provided. <br />1. Demolish the block wall $ 32.40 <br />6' x 5' x 6" = 30 sq ft @ $1.08/sq ft <br />2. Demolish the concrete wall <br />6' x 5' x 10" = 30 sq ft @ $7.87/sq ft $ 236.10 <br />Sub total $ 268.50 <br />3. Congested Site Factor - add 200 $ 537.00 <br />Sub-total $1,342.00 <br />c'T°Tr ~F COLORADO <br />1111111111111111111 <br />~~~~~ <br />DEPARTMENT OF <br />HARD COPY TO FOLLOW NATURAL <br />RESOURCES <br />