Laserfiche WebLink
CIRGES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 001 <br />Date : 09/052003 <br />User: JD1 <br />State :Colorado <br />County :Fremont <br />Site :Cherokee Clav Mine <br />PennifCob# :M-1977-325 <br />Abbreviation :none <br />Filename :M325-001 <br />Agency or organization name :DMG <br />Permit or otherjob action :Final Reclamation <br />Task description :Grade entire disturbed area <br />.:::: ;: _ <br />_.,: <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D7R Series 11 LGP - 7S Horsepower : 240 <br />Blade type :Straight <br />Attachment no. 1 : BOPS Cab Shift basis : i perday <br />Attachment no. 2 : NA <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $39.23 NA <br />OperatingcosUhour : $52.71 100 <br />Ripper op.cosUhaur : $0.00 NA <br />Operator cosUhour : $31.83 NA <br />Total unit cosUhour : $123.77 Total fleet cosUhour : $123.77 <br />:: <br />MATERIAL QUANTITIES ;;: _::: <:_ r <br />Initial Swell Loose <br />volume : 6,000 LCY factor : NA volume : 6,000 LCY <br />Unadjusted howdy production : 369.6 LCY/hr <br />Material consistency description <br />Loose stockpile <br />Average push gradient : 0.50 % (i <br />Average site altitutle : 5,900 feet <br />Material weight : 2,650 Ibs/LCY <br />Weight description <br />Decomposed rock - 25% Rock, 75% EaRh <br />Dozing method : 1.20 (slot) <br />Visibility : 1.00 (avg.) <br />Job efficiency : 0.83 (lshilVday <br />Spoil pile : 0.80 (tnd-rf) <br />Push gradient : 1.01 (Cat HB) <br />Altitude : 1.00 (Cat HB) <br />Material weight : 0.87 (Cat HB) <br />Blatle type : 1.00 (S/SU/V) <br />Net correction : 0.63 <br />Adjusted unit production : 232.46 LCY/hr <br />Adjusted fleet production : 232.46 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) Total job time : 25.81 Hours <br />Unit cost : $0.532 /LCY Total job cost : $3,195 <br />