My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-11-02_REVISION - M1987028
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1987028
>
2004-11-02_REVISION - M1987028
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:41:38 AM
Creation date
11/21/2007 9:22:27 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1987028
IBM Index Class Name
Revision
Doc Date
11/2/2004
Doc Name
FW Increase
From
DMG
To
Colorado Marble LLC
Type & Sequence
SI1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TrucklLoader Team Work cont'd Task p: 008 sheet 2 of 2 <br />,: ;. <br />Loading Toot Cvcle Time . Number of loading tool passes required to fill truck : ` 3 passes <br />Excavators and front shovels -machine cyde time vs. job condition rating : NA <br />-selected value within basic rating : NA <br />Track loaders -material descr.: NA <br />- cyde time elements (min.) : Load : NA Maneuver : NA Dump : 0.100 <br />Wheel and track loaders -unadjusted basic loader cyde time (load, maneuver, and dumF 0.500 minutes <br />Cyde Time Factors Loading Condition Descdp8on Factor (min.) Source <br />Material . Mixed mateda! 0.020 (Cat HB) <br />Stockpile : Conveyor or dozer piled f0 ff. high and up 0.000 (Caf HB) <br />Truck ownership : Common ownership of trucks and loaders -0.040 (Cat HB) <br />Operation : Constant operation -0.040 (Cat HB) <br />Dump target : Nominal target 0.000 ' (Cat HB) <br /> Net cycle time adjustment : -0.080 minutes <br /> Adjusted loader cyde lime (total time per loader pass) : 0.440 minutes <br /> Net load time per tack' : 0.980 minutes <br />TNCk Cvele Time : ' Culk of 1st loader cyde wmQleled during Wdc exchange If a0l.loader cyde tirre <exchange time <br />Truck exchange time "': 0.50 minutes........ Adjusted for site altitude : 0.562 minutes <br />Truck load time: 0.980 minutes........ Adjusted for site altitude : 1,256 minutes <br />Truck maneuver and dump time: 0.90 minutes........ Adjusted for site altitude : 1.011 minutes <br />set at 0 ii exchange time <adj.loader cycle time (tack exchange cortplele0 during 1st loader cyde) <br />Truck travel (haul & return) time: Road condition :NA-user <br />Haul route <br />Road <br />segmenttt Haul distance <br />(miles) Grade <br />res. (°k) Rolling <br />res. (%) Total <br />resistance (9°) Speed <br />(m!!es/hour) Travel time' <br />(minutes) <br />1 15 NA-user NA-user NA-user 45 20.000 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Return ro ute : Haul time ": 20.000 <br />1 15 NA-user NA-user NA-user 45 20.000 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />ninutes <br />' travel time shown for each segment Includes acceleration/deceleration adluetment Return time": 20.000 minutes <br />total haul and return tlme shown Includes altitude atlluslment Total truck cycle time : 42.829 minutes <br />Loading tool unit production : 51727 LCY/hour...... Adjusted forjob efficiency : 429.33 LCY/hour <br />Truck unit production : 21.98 LCYmour:..... Adjusted forjob efficiency: 1B.23 LCY/hour <br />OpBmal no, tmcksAOatling too! ; 24 tacks........... Selected no. truckslloader : 24 tracks <br /> Adjusted houdy truck team production : 43743 LCY/hr <br /> Adjusted hourly single trucWloader team production : 429.33 LCY/hr <br /> Adjusted houdy multiple tmdNOader team production : 429.33 LCY/hr <br />IOB TIME AND COST <br />Fleet size : ! Team(s) Total job time : 23.02 Hours <br />Unit cost : x9.786 /LCY Total job cost : 298.642 <br />
The URL can be used to link to this page
Your browser does not support the video tag.