My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-11-02_REVISION - M1987028
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1987028
>
2004-11-02_REVISION - M1987028
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:41:38 AM
Creation date
11/21/2007 9:22:27 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1987028
IBM Index Class Name
Revision
Doc Date
11/2/2004
Doc Name
FW Increase
From
DMG
To
Colorado Marble LLC
Type & Sequence
SI1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.. <br />HOURLY PRODUCTION sheet 2 of 2 <br />Haulino Caoacitv: <br />Scraper Payload (weight) Basis : Scraper Bowl (volume) Basis : <br />Material weight : 2,900 pounds/LCY Struck volume : 21.00 LCY <br />Material description <br />t7ecomposed rock - 50% Rock, 50% Earth <br />Rated payload : 75,000 pounds <br />Payload capacity : 25.86 LCY <br />Heaped volume : 31.00 LCY <br />Average volume : 26.00 LCY <br />Adjusted capacity : 25.88 LCY "* <br />hourly production reflects volume per scraper pair on push-pull models <br />Cvcle Time : ob Condition Corrections : Site altitude (ft.) : 11,000 <br /> Scraper Push dozer Source <br />Scraper loading time' : 2.40 minutes Altitude adj.: 0.970 NA (Cat HB) <br />Maneuver and spread time : 0.70 minutes Job efficiency : 0.830 NA (Cat HB) <br />`load time per scraper pair onpush-pull models Net correction : 0.$05 NA <br />Travel time <br />Road condition description :Rutted dirt, little maintenance, no water, 2"tire penetration <br />Haul Route <br />Seg. # Haul distance (feet) Grade (%) Roll, res. (%) Total res. (%) Velocity (fpm) Travel time (min.)*` <br />1 600 0.00 5.00 5.00 1343 0.55 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Return route <br />Haul6me: 0.55 minutes <br />•• travel time for each segment is adjustad foraccetere6on/deceleration. Return time : 0.46 minutes <br />table velocities are maz, attainable per total resistance shown, not average <br />Total scraper team cycle time (load + haul + maneuver and spread + return) : 4.72 minutes <br />Unadjusted unit production(hour : 377.08 LCY/hour "' Adjusted for job conditions : 303.59 LCY/hour <br />Optimal number of scrapers per push dozer : NA Selected number of scrapers : 2 scraper(s) <br />Adjusted single scraper team (unit) hourly production : 607. i 7 LCY/hour <br />Adjusted multiple scraper team (fleet) hourly production : 807. i7 LCYlhour <br />JOB TIME AND COST <br />Fieet size : 1 Team(s) <br />Total job time : T9.30 Hours <br />Unit cost : ;1.007 lLCY Totat job cost : $48,491 <br />
The URL can be used to link to this page
Your browser does not support the video tag.