Laserfiche WebLink
<br />i <br />%~ <br />ii% <br />N <br /> <br />FUEL TANKS <br />PORTABLE <br />UNIT <br />N <br />O <br />O <br />to m <br />ma <br />n~ <br />~~ <br />O <br />Z ~ <br />A <br />"AFFECTED LAND" <br />PHASE ONE: THE FLOOR AREA OF THE EXISTING PIT WILL BE U <br />CONSIST OF APPROXIMATELY 3.0 ACRES. 1 ACRE WILL BE USE[ <br />PHASE TWO: MINING WILL ADVANCE TO THE WEST AND NORTH <br />FEET IN LENGTH AND ALMOST VERTICAL DURING MINING OPERATIC <br />PHASE THREE: IN CONJUNCTION WITH MINING OPERATIONS RECL <br />THEREAFTER UNTIL COMPLETED. <br />ALINING WILL COMMENCE IN THE YEAR 2001 AND CONTINUE UNTI <br />EASTERLY. THE OVERBURDEN CONSISTS OF 3" TO 6" OF TOPSC <br />GROUND WATER WILL BE ENCOUNTERED. ANY WASTE ROCK ENC <br />ESTABLISH STORM WATER RUNOFF CONTROL AND OFF SITE DRAIA <br />WILL BE HAULED IN FROM OFF SITE LOCATIONS FOR DUST CONT <br />IS 12' TO 14' THICK, AND NO OTHER PRODIJCTS SHOULD BE <br />LANDS" SHALL BE TEN ACRES. <br />TOTAL AREA OF "AFFECTED LAND" WILL BE 10 (TEN) ACRES. <br />.JItivVER OFFICE <br />~"IJIBLIC FILE COPY <br />File: <br />Slto~ <br />Acton: <br />~~ <br />NOV 2 6 2001 <br />Grand Junction Field Office <br />iDivlsion of Minerals & Geobyy <br />I <br />'MER' S CONS T. <br /> DATE COLORADO <br /> 03/27/01 DUNTAIN <br /> DATE AfAGES <br /> 10/!2/01 (970) 327-4400 <br /> SHEET PROJECT N0. <br /> 2 of 3 E <br />201336 <br />~~' Size ~rIC~,I~~1I <br />Irr G:a~J SIB-Lc"F;~.n O~(ce <br />TI I~ s. <br />