Laserfiche WebLink
-3- <br />• <br />10. Primary future Cropland<CR) _ Pastureland(PL) _ General Agrlculture(GA) <br /> (Post-mining) X RangelandCRL) <br />forestry(FR) Wildlife Habitat<WL) <br /> land use _ <br />~ Residential(RS) Recreation(RC) _ <br />Industrial/Commerclal(IC) <br /> (check one): _ Developed Water Resources(WR) _ Solid Waste Olsposal(WD) <br />ll. Primary rep sent _ Cropland(CR) Pastureland(PL) _ General Agrlculture(GA) <br /> land use Forestry(FR) <br />Rangeland(RL) Nlldlife Habitat(WL) <br /> (check one>: _ <br />_ <br />Resldential(RS) Recreation(RC) x Industrial/Commercial(IC) <br /> _ Developed Water Resources(WR> <br />12. Method of Minims : _ Quarry (QR) ~ Solution (SO) <br /> 12a. Other: Br iefly explain mining method (e.g. Placer, truck/shovel). <br /> Drv sand pit wi[h on site processing (washing) <br />13. On Site Processi Solution (SO> Chemical (CH) _ Thermal (TH) <br />ns: <br /> _ <br />Vdt Leach <VL) <br />Heap Leach (HL) <br /> water wash sy _ <br />stem _ <br />14. Application Fee: <br /> The application fee for Quarry mining 15 52,325. <br /> The application fee for Solution mining or any Chemical or Thermal Processing <br />• is 53,100. <br /> If none of these methods or processes are to be included in the operation then the <br /> application fee is (1,815. <br /> The application fee for conversion to a 112 permit is 51, 500. <br /> 112 Amendment ap plication fee 1s 51,550. <br />An applicant will not be issued a reclamation permit until notified by the Division that <br />this application and the required performance and financial warranties have been <br />approved. Alternatively, an automatic approval will occur where the Division falls to <br />notify the applicant/operator that the application has been dented. The final agency <br />action must be made within 120 calendar days from the date the application was <br />submitted. However, the performance and financial warranties must be approved by the <br />Division or Board before a permit will be issued even if you receive an automatic <br />approval. NO MINING OPERATIONS SHALL BEGIN UNTIL A PERMIT IS ISSUED (Rule 7.2(2)). <br />It shall be a provision of this permit that the operations will be conducted 1n <br />accordance with the terms and conditions listed 1n your application, as well as with the <br />provisions of the Act and the Mineral Rules and Regulations in effect at the time the <br />permit 15 issued. <br />r1 <br />U <br /> <br />