Laserfiche WebLink
~~ <br />III IIIIIIIIIIIII III ~ <br />5 SATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, CO 80203 <br />Phone:130310h6-3567 <br />FAX: (3031 8328106 <br />December 8, 1993 <br />Neil C. and Judy Sprague <br />Arkins Park Stone Corp <br />5975 NCR 27 <br />Loveland, CO 80538 <br />Re: Sprague-Red Lyons, Succession Approval, Permit No. M-81-057, <br />Revision No. SO-001 <br />Dear Mr. and Ms. Sprague: <br />OF'~~(O <br />ti~4 <br />~e <br />re T6 ~ <br />Roy Romer <br />Governor <br />Michael B. Long <br />Division Director <br />On August 27, 1993 the Colorado Mined Land Reclamation Board approved the succession <br />of operators from Berthoud Pink Stone to Arkins Park Stone Corp for this operation. <br />Arkins Park Stone Corp. is now the permitted operator of the Sprague-Red Lyons, and <br />as such, is responsible 1'or all provisions in Permit No. M-81-057, as well as those <br />specified in the Minerals Rules and Regulations. Berthoud Pink Stone is relieved of <br />all responsibilities concerning this operation (See Mineral Rules and Regulations <br />Number 1.7). <br />The Division would like i:o remind you, as the permitted operator, about a few things <br />we feel are important: <br />1. All of the application materials, as amended and supplemented, are an integral <br />part of your permit. They have been incorporated into the permit by reference. We <br />presume that you have a copy of all of these materials; therefore, none have been <br />enclosed with this mailirlg. We suggest that you keep a copy of the permit and the <br />permit application at the mining operation as a reference for operating personnel, <br />to help ensure compliance with the terms of the permit. <br />2. Changes in the mining and reclamation operations that differ from those <br />described in the permit mlay require a revision to the permit. We suggest consulting <br />the Mineral Rules and Regulations and/or contacting us to determine if a revision to <br />the permit is necessary. Rule 1.8 pertains to Amendments, Rule 1.9 to Technical <br />Revisions, and Rule 1.10 to Conversions. <br />3. On your permit anniversary date each year, you must submit an annual fee and <br />annual report to us. Please consult Rule 3.4 for 110 Mineral Permits, Rule 2.4 for <br />112 Permits, and Statute Section 34-32-116(1)(a) for 111 Permits, for the specific <br />annual report requirements applicable to your mine. <br />If you have any questions, contact me. <br />Since ly, <br />~oz,C2.~t~--~. <br />Wi 1 1 i am C. York-FGeii'rn <br />Environmental Protection Specialist <br />WCY/ern 6718G <br />