My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV04914
DRMS
>
Back File Migration
>
Revision
>
REV04914
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:03:11 AM
Creation date
11/21/2007 9:21:27 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981022
IBM Index Class Name
Revision
Doc Date
6/14/2007
Doc Name
Cost Estimate
Type & Sequence
TR56
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />164 <br /># State :Colorado PermiVjob# : C-1981-022 <br />: <br />Task <br />Date : 0 6/1 42 00 7 County :Delta Abbreviation :none <br /> Site :Elk Creek Mine Filename : C022-164 <br />User : JRS <br />or organization name : <br />enc <br />A Colorado Division Of Reclamation, Mining And Safety <br />y <br />g <br />Permit or other job action : Technical Revision 56 <br />Task description : Replace Topsoil from Stockpile to Four Drill Pads <br /> <br />HOURLY EQUIPMENT COST ;.:. <br /> <br />405 <br /> Basic machine :Cat D9R - 9SU (2005) Horsepower : <br /> Blade type :Semi-Universal <br /> Attachment no. 1 :ROPS Cab Shift basis : 1 perday <br /> Attachment no. 2 :3-shank ripper <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $72.92 NA <br /> Operating cost hour : $98.84 100 <br /> Ripper op. cosUhour : $0.00 0 <br /> Operator cosVhour: $32.78 NA <br /> Total unit costlhour : $204.53 Total Fleet cosUhour : $204.53 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 1,200 BCY factor : 1.250 volume : 1,500 LCY <br />Source of estimated volume :Division Estimate <br />Source of estimated swell factor :CAT Handbook <br />Source <br />Average push distance : 75 feet <br />Unadjusted hourly production : 1,514.3 LCY/hr <br />Material consistency description <br />Consolidated stockpile <br />Average push gradient <br />Average site altitude <br />Material weight <br />Weight description <br />Earth -Dry packed <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) <br />Unit cost : $0.333 /LCY <br />5.00 % (1 <br />7,500 feet <br />2,550 Ibs/LCY <br />Operator skill : 0.75 <br />Material consistency : 1.00 <br />Dozing method : 1.00 <br />Visibility : 1.00 <br />Job efficiency : 0.83 <br />Spoil pile : 0.80 <br />Push gradient : 0.90 <br />Altitude : 1.00 <br />Material weight : 0.90 <br />Blade type : 1.00 <br />Net correction : 0.41 <br />Adjusted unit production : 614.36 LCY/hr <br />Adjusted fleet production : 614.36 LCY/hr <br />.;::.:::.. <br />Total job time : 2.44 Hours <br />Total job cost : $499 <br />
The URL can be used to link to this page
Your browser does not support the video tag.