Laserfiche WebLink
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />164 <br /># State :Colorado PermiVjob# : C-1981-022 <br />: <br />Task <br />Date : 0 6/1 42 00 7 County :Delta Abbreviation :none <br /> Site :Elk Creek Mine Filename : C022-164 <br />User : JRS <br />or organization name : <br />enc <br />A Colorado Division Of Reclamation, Mining And Safety <br />y <br />g <br />Permit or other job action : Technical Revision 56 <br />Task description : Replace Topsoil from Stockpile to Four Drill Pads <br /> <br />HOURLY EQUIPMENT COST ;.:. <br /> <br />405 <br /> Basic machine :Cat D9R - 9SU (2005) Horsepower : <br /> Blade type :Semi-Universal <br /> Attachment no. 1 :ROPS Cab Shift basis : 1 perday <br /> Attachment no. 2 :3-shank ripper <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $72.92 NA <br /> Operating cost hour : $98.84 100 <br /> Ripper op. cosUhour : $0.00 0 <br /> Operator cosVhour: $32.78 NA <br /> Total unit costlhour : $204.53 Total Fleet cosUhour : $204.53 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 1,200 BCY factor : 1.250 volume : 1,500 LCY <br />Source of estimated volume :Division Estimate <br />Source of estimated swell factor :CAT Handbook <br />Source <br />Average push distance : 75 feet <br />Unadjusted hourly production : 1,514.3 LCY/hr <br />Material consistency description <br />Consolidated stockpile <br />Average push gradient <br />Average site altitude <br />Material weight <br />Weight description <br />Earth -Dry packed <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) <br />Unit cost : $0.333 /LCY <br />5.00 % (1 <br />7,500 feet <br />2,550 Ibs/LCY <br />Operator skill : 0.75 <br />Material consistency : 1.00 <br />Dozing method : 1.00 <br />Visibility : 1.00 <br />Job efficiency : 0.83 <br />Spoil pile : 0.80 <br />Push gradient : 0.90 <br />Altitude : 1.00 <br />Material weight : 0.90 <br />Blade type : 1.00 <br />Net correction : 0.41 <br />Adjusted unit production : 614.36 LCY/hr <br />Adjusted fleet production : 614.36 LCY/hr <br />.;::.:::.. <br />Total job time : 2.44 Hours <br />Total job cost : $499 <br />