Laserfiche WebLink
<br />Carl Mourrt <br />March 14, 1991 <br />Forge 2 <br /> <br />Comment 2) : In the WET report (page 1) it is stated: "Gtsnbired flows fran <br />existing culverts N acrd P as well as half culvert O will be conveyed <br />along the western aryl southern sides of the West Ridge Waste <br />Disposal area in i~roved Channel AA~7J and conveyed to the existing <br />detention pond." It is unclear whether COVCC is going to extend <br />these culverts to proposed Charuiel AA~7J or Create Protected <br />channels fmn the outlets of these culverts to Channel AA~7J. <br />Please provide details as to what COVOC interns to do. <br />Reply 2) : An existing riprap protected c~an*wi will corney water fr~n the <br />outlet of culvert N to the t~,~t reach of t~hanrwl AA. Half- <br />ruud culvert O extends from the r-nichim and SCrBPlring level to <br />disc3~arge directly into c3rarv~el AA. The riprap in d~a~vrel AA has <br />been sized in aowrdanoe with the anticipated 100-year, 24-hour flow <br />event. Flows fr+an culvert P will eventually be conveyed to charuwl <br />EE and be Hooked thrax~ half culvert O. This will be accca~q~lished <br />by grading the area arorud the sewage treatment plant to drain <br />toward channel EE following removal of the plant. Map No. 6A-5D has <br />been revised to show this change in grade. <br />Camtw~t 3): The WET report also states on page 4: "...flows fran the Office, <br />Shop and Waralwuse that currently flora into culvert K will <br />eventually be diverted into cannel T." It is unclear how this will <br />be done even though the present design parameters for Channel AA <br />acv mwc that this well be done. The proposed Map 8-1 shows the <br />culvert K outlet such that water flowing through the culvert enters <br />the natural drainage cannel directly east of designed Channel T. <br />If COVCC plans to extend culvert K or eliminate this culvet"t it <br />should be clearly stated how aryl when these tasks will be done. <br />Reply 3): Cxnrrent plans call for culvert K to be removed during the final <br />abandorm~ent phase of reclamation at the OrG~atti Valley mine. Upon <br />removal, channel U will be reconfigured and resized as necessary to <br />wrrvey flows into channel T. <br />Revised ditch design calculations submitted herein are based upon work generated, <br />by Greystone Development Consultants and approved as TR-9. The resultant <br />drainage schematic pages aryl calculation sheets frwn TR-9 weren't formally <br />incorporated into the permit document. In crier to provide a specific reference <br />for these materials, I propose that they be included in Volume 8 order the tab <br />entitled "Drainage -Design and Location." 'These materials should appear <br />immediately following the OVNII+I Water Tank and Ventilation Shaft Sites S7na11 Area <br />bcemption Application. The new design specifications for channel E~ arrl the <br />calculations for the small temporary ir~oundment by culvert P should be appended <br />to this section. The table of contents for Volume 8 has been revised accordingly <br />and is included with this submittal. <br />