My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV04861
DRMS
>
Back File Migration
>
Revision
>
REV04861
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:03:07 AM
Creation date
11/21/2007 9:21:04 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977436
IBM Index Class Name
Revision
Doc Date
9/5/2000
Doc Name
CAMAS COLO INC TOWER PIT 1 PN M-1977-436 AM-001
From
DMG
To
CITY OF BRIGHTON
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• ~ raZS <br />OFFICE OF THE STATE ENGINEER <br />Division of Water Resources <br />Department of Natural Resources <br />1313 Sherman Street, Room B18 <br />Denver, Colorado 80203 <br />Phone: 13031 866-3581 <br />FAX: (3031866-3589 <br />httpl/waterstate.co.us/defau h.htm <br />STATE OF COLORADO <br />q`a9 <br />RECEIVED °` `° <br />He <br />AUG 3 02000 ~•.~•~ <br />~i~;5i~;. ~F a7i;:rr-k and Geology <br />Response to Reclamation Permit Application Consideration <br />TO: Carl 6. Mount, Senior Environmental Protection Specialist <br />CC: Division 1 Office; District 2 Water Commissioner <br />FROM: Kevin G. Rein, Water Resource Engineer <br />DATE: August 30, 2000 <br />RE: Tower Pit No. 1, File No. M-1977-436 <br />Section 23, Twp 1 S, Rng 67 W, 6th P.M., Adams County <br />Operator: CAMAS Colorado, Inc. <br />Contact: CAMAS Colorado, Inc. <br />3605 S. Teller St., Lakewood, CO 80235 <br />(303) 985-1070 <br />Bill Owens <br />Governor <br />Greg E. Walther <br />Executive Director <br />Hal D. Simpson, P.E. <br />Sale Engineer <br />CONDITIONS FOR APPROVAL <br />^ The proposed operation does not anticipate exposing groundwater. Therefore, exposure of <br />ground water must not occur during or after mining operations. <br />X The proposed operation will consume ground water by: X evaporation, X dust control, X <br />reclamation, X water removed in the mined product, X processing, ^ other <br />Prior to initiation of these uses of ground water, the applicant will need to obtain either a <br />gravel pit or other type of well permit, as applicable. However, prior to obtaining a permit, <br />an approved water supply plan or decreed plan for augmentation is required. <br />X Prior to approving a well permit, the applicant must conduct a field inspection of the site and <br />document the locations of all wells within 600 feet of the permit area. The applicant must <br />then obtain a waiver of objection from all well owners with wells within 600 feet of the permit <br />area or request a hearing before the State Engineer. <br />^ Other: <br />COMMENTS/NOTES: <br />
The URL can be used to link to this page
Your browser does not support the video tag.