My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV04860
DRMS
>
Back File Migration
>
Revision
>
REV04860
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:03:07 AM
Creation date
11/21/2007 9:21:04 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Revision
Doc Date
2/4/2002
Doc Name
3 Letters in One, Need to Separate
Type & Sequence
TR95
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
`. COLORADO DIVISION OF MINERALS AND GEOLOGY f~ECEIVED <br />1313 Sherman Street, Room 215, Denver, Colorado 80203, (303) 866-3567 <br />2~~ <br />APPLICATION FORM FOR A REVISION Division of iNinerals and Gealapy <br />TO A COAL MINING AND RECLAMATION PERMIT <br />This form must be completed and submitted with all requests for minor revisions, as defined in Rule 1.04(73), <br />technical revisions, as defined in Rule 1.04(136), and permit revisions, as defined in Rule 1.04(90). All revisions <br />are to address the requirements of Rule 2.08.4. Three (3) copies of the revision, including maps, must be <br />submitted in order for it to be complete. <br />All revisions are to be formatted so they can be inserted into the permit to replace the revised sections, maps, <br />tables and/or figures, with a revised table of contents, if necessary. The revision submittal date should be printed <br />in the lower right comer of each revision page. A cover letter to the revision should explain the nature of the <br />revision and reference the specific permit sections being revised. <br />For federal mines, a copy of the revision application must be submitted to all agencies on the federal mailing list <br />(except OSM) at the same time the application is submitted to the Division, and proof of distribution must be <br />submitted to the Division along with the application. Copies of revision pages modified during the review process <br />must be distributed in the same manner, along with proof of disVibution. Proof of distribution must be submitted <br />prior to implementation of the revision. <br />Permit No.: C - 80 - 007 Date: 01 / 25 / 02 <br />Permittee: Mountain Coal Company L.L.C. <br />West Elk Mine <br />Street: P.O. Box 591 <br />city: Somerset <br />State: C~ Zip Code: 81434 <br />Brief Description of Revision: Technical Revision No. 95 (TR-95) <br />Incidental Boundary Change - Incorpor- <br />ation of Federal Lease Modifications, <br />Permit Area and Mine Plan Change <br />Public Notice Attached: Yes / No (Required forPRs and TRs) <br />Bond Increase: Yes _ No ~ Federal !' Non-Federal _ Mine <br />Proposed Change in: <br />Permit Area - <br />Disturbed (+/-) _ _ _ _ Acres <br />Surface Ownership - <br />Private Land (+/-) _ _ _ _ Acres <br />Permit (+/-) _ ? 73_ . 3 Acres <br />Affected (+/_) _ tt3 s Acres <br />Mineral Ownership - <br />Mineral Private (+/-) _ _ _ -Acres <br />Mineral Federal (+/-) _ 1 f 3 3 Acres <br />Federal Land (+/-)_ tt3 s Acres <br />State Land (+/-) _ _ _ _ Acres <br />Mineral State (+/-) _ _ _ _ Acres <br />
The URL can be used to link to this page
Your browser does not support the video tag.