Laserfiche WebLink
_-08-12-1996 16:02 P.09 <br /> <br /> <br /> <br /> B <br />• Rearove all rocks, clods vegetsdon or on tmtrom, large netting on top. <br />other obrttitcdons w that the inrtalled • Overlap adjacent rolls a minimum of 3". <br />LANDLOK^' EROSION MAT>,ill have • lay mat ]ttosdy and maintain dirett <br />direct contatt with wil outface. contact with wa DO NOT PULL MAT <br />• I?o not mulch tree when ma[ le ro be TAUT which may allow bridging of soli <br />placed. sorbs. <br /> • Secure mat ro ground surface using <br />• Seed mat beSore irutallatlon far erosion U"eheped wire anplee (preferred), <br />control and revegetadon or after Inrtal- gtxtexNe pins or wooden stakes. See <br />Loon for turf telttfortxment GROUND AIVCtI0R1NG DEVICES <br />• When seeding prior ro mat ineta0adan, (adjaunt colurmr). <br />all check dou sad oWa erua disturbed ~ Refer ro ANCAOR PATTERN GUIDE <br />during installadon moat reseeded. (Page 4) for appropriate number and <br />• Where roil filling 4 rpeeitied. Deed mat- pattern of aarhon. <br />ring end entire dlsaubed ens after !n• <br />ttalladon, prior ro filling mtt with wil. , • Dig Wtial anchor wench 12" deep and <br /> 6" wide auto the channel at the lower <br />U-rtseped win staples, meal geoteztile ~ ~ end of the project area [Figure 2J. <br />make pins of ttiatrgtdar wooden stakes can • Excavate intermittent check sloe 6"deep <br />be used to anchor man to the ground our- turd 6" wide across the c2tntrnel at 30' <br />ftce. Wire staples should be a minlmttm intervele along the eheaneJ (Figure 31 <br />o! a gauges Metal uabe pine ehouid be • Cut longimdlnel channel anchor slots 4" <br />3116' diameter creel with a 1'/~ steel deep and 4" wide along each side othee <br />washer at the toad of the pin. Wire etapla inatalledon ro bury edges of mntting <br />and metal stake pins should be driven (figure 4J. Whenever possible, extend <br />flush ro the wr1 surface. Wooden stakes matting 2' • 3' above crest of channel side <br />ehouldbe3":1'/r" trianguLrwtroden ropes. <br />survey stakes.'hvo inches of wood staking • Beginning at the downstream end end In <br />shnuld retnein above the sot? ourftce. AD the center of the channel, place the Wtial <br />anchors shauki be 8" - 18" bng and have end of the first roll In the anchor vench <br />ruftidcnt ground penetration ro ruler end oecwe with fastening devices at 1' <br />ptdlout. Longer anchors may tx required intetvaLs Kota tnatting will initiaDy be <br />for loose toils. upside down in anchor trench, Umaller <br /> nettng on top) [Figure 2J. <br />• Gnde and compatt area of lnrtalletioa ~ • Extend matting 2' - 3' over crest of sbpe <br />• Prepare seedbed try loosening 2'-3' of ~ and dig 12' z 6" anchor trench. <br />topwil above final grade. • Anchor mat In trench on 1' spaatrgs, <br />• Incorporate amendments ouch u lime : ' ' 1 beddil! and rnmpatt Boil. <br />and ferdllzer into wit. 1 • Unroll mat down slope with amnl] nettirr <br />F7ptrn J: InHnnlfJrrrt Cheat Slol <br />flpnn 2: !nltla/ CAanavl Anchor Tntncb <br />