Laserfiche WebLink
FINANCIAL WARRANTY REQUII2EMENT RE-EVALUATION <br />SAN LUIS PROJECT, M-88-112 <br />November 13, 2001 <br />TASKS AND COST ESTIMATES FOR REMAINING RECLAMATION OBLIGATIONS <br />(excluding West pit water manaeement costs) <br />A) Waste rock disposal areas -Total $121,822 <br />A.1 South waste rock disposal area - 15 acres of outslope grading @ $3,415/ac re = $51,225 <br />- 15 acres of topsoil replacement @ $2,567/acre = $38,505 <br />- Reseeding costs - 50 acres @ $284/acre = $14,200 <br />- Total = $103,930 <br />A.2 Waste rock disposal area B -Reseeding costs @ $284/acre for 18 acres = 35,112 <br />A.3 Waste rock disposal area C -Reseeding costs @ $284/acre for 15 acres = 54,260 <br />A.4 Waste rock disposal area D -Reseeding costs @$284lacre for 25 acres = $7,100 <br />A.5 East pit disposal area -Reseeding costs @$284lacre for 5 acres = $1,420 <br />B) Tailings Disposal Area - $305,488 <br />B.1 Backfill 17 acres @ 4 foot depth average - 109,707 cu-yds @ $.63/cu-yd = $69,115 <br />B.2 Grade backfill material - $4,388 <br />B.3 Re-establish east watershed through impoundment; includes grading low flew trickle <br />channel - 4,667 cu-yds for the channel and 15,000 cu-yds for re-establishin,; natural <br />grade @ $.26/cu-yd = $5,113 <br />B.4 Armor low flow trickle channel -Process 1,700 cu-yds on site @ $10/cu-yd = $17,000 <br />- Transport 1,700 cu-yds @ $1.53/cu-yd = `2.608 <br />- Place 1,700 cu-yds @ $4.82/cu-yd = $8, l94 <br />- Total = $27,802 <br />B.5 Topsoil replacement - 35 acres @ $2,567/acre = $89,845 (includes grading ~.opsoil) <br />B.6 Regrade diversion ditches - 9 acres @ $3,415/acre = $30,735 <br />B.7 Spillway construction- $15,575 <br />B.7. I Excavation - 7 acres @ $540/acre = $3,780 <br />B.7.2 Concrete delivery & placement = $5,000 <br />B.7.3 Rip rap preparation = $4,000 <br />