My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV04763
DRMS
>
Back File Migration
>
Revision
>
REV04763
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:02:59 AM
Creation date
11/21/2007 9:20:28 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Revision
Doc Date
7/13/1995
From
BMRI
To
DMG
Type & Sequence
TR18
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
iii iiiiiiiiniiiiii . <br />sas <br />BATTLE MOUNTAIN RESOURCES, INC. <br />July 10, 1995 <br />RECEIVE® <br />JUL 13 1995 <br />Jim Dillie IJivieion of minerals & Ge0lpgy <br />Division of Minerals and Geology <br />1313 Sherman Stree[, Room 215 <br />Denver, Colorado 80203 <br />~~,1 <br />Dear Mr. Dillie: <br />RE MOUNVJN <br />IXD COMPANY <br />g_ta-4 S <br />This letter is in response to your letter dated June 30, 1995. The following is our understanding <br />of the status of outstanding items and an expected time frame for responding to those items <br />which require a response front BMRI. <br />I. Outstanding Technical Revisions <br />A. TR-1 S Monitoring groundwater beneath tailings facility upon closure. 1dMRI is in <br />the process of reviewing the status and determilting an appropriate response to outstaa!rttding <br />comments on TR-15. Our initial review indicates that drilling and monitoring of the angle holes <br />may not be as effective as. originally hoped. We are revisiting other methods to accomplish the <br />monitoring objectiyeg, , We.hope to have respohs25 back to yoti by September. . <br />B. TR-17 Process Fluirl Transfer Procedures. Ourle[fer to the Division dated July 7, <br />1995 should:answer all of the Divisions concerhs and'r"ortiinants.l • "=; ~~ -.:,.~ ,.,: - <br />C. TR-18 Permit,Modification, Partial backfilling of West Pit. Additional ~eochemical <br />information and request for conditional approval ~1vi11'tie'sent fo the Division July 12, 199. <br />D. TR-22 Environmental Protection.Plan. We have received your comments on TR-22 <br />and are in the process of gathering additional information. BMRI expects to have re#ponses to <br />yotl by the end of July. <br />II. Outstanding issues from 1992 N.O.V. <br />It is our understanding that the abatement schedule is no longer required. Apthough we <br />have not received written comments from the Division olt our initial Reclamation Evtaluation <br />Report, we did meet with the Urvision and we are prepaying a suntrnary of rasporses to <br />comments raised by the Division during the meeting. We expect to have this submittal ready i1t <br />early September. Should you seltd us something prior to September we will be prep#red to <br />answer any of your questions in [his submittal as well. <br />III. Other outstanding issues <br />A. Phase II Raise I approval. We appreciate receiving approval for Phase 1~ raise I and <br />consider that issue resolved. <br />B. M-14 water level readings. A letter regarding water level readings of M~14 will be <br />sent under separate cover,. <br />C. INCO monitoring: Difterent regliireittcnt;-for INCO monitoring were contained in <br />TR-006 and TR-010. Since TR-006. was approved after TR-0! 0 there ha; been som@ confusion <br />over which requirements apply. We have submitted TR-023 in an attempt to clarify this <br />confusion. <br />A SUBS10/ARY OF 8A7TLE M170 UNTALV GOLD COMPANY <br />P.O. BOX 310 SAN LUIS, COLORADO BI 1520310 (719) 672 3762 FAX (719) 672-3367 <br />
The URL can be used to link to this page
Your browser does not support the video tag.