Laserfiche WebLink
RECLAMATION CO~UMNARY cont'd S11Fet 3 of 4 <br />H. EARTHNORK - STREAM CHANNEL RECONSTRUCTION <br />Task No.~ Task Description ~ Cost (S) <br />_______I_________~________________________________________~__~_______ <br />Subtotal (H): <br />____________ <br />1. EARTHNORK - DRAINAGE CONTROL SYSTEM INSTALLATION/REMOVAL <br />Task No.~ Task Description ~ Cost (S) <br />Subtotal (I): <br />J. EART HI)URK - TOPSOIL/SUBSOIL REPLACEMENT <br />Task No.~ Task Description ~ Cast (S) <br />________I_____________~_________________~___~________._____I__.________ <br />OSa ~ Replace an average of 9 inches of topsoil over ~ 59,720 <br />a maximun 24.79 acres of disturbed area requiring <br />recoiling. <br />Subtotal (J): 59,720 <br />