My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV04688
DRMS
>
Back File Migration
>
Revision
>
REV04688
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:02:53 AM
Creation date
11/21/2007 9:19:59 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981022
IBM Index Class Name
Revision
Doc Date
10/3/2003
Doc Name
Proposed Decision Letter & Forms
From
DMG
To
Oxbow Mining LLC
Type & Sequence
RN4
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
oF'~oto <br />F <br />'.,` COLORADO DIVISION OF MINERALS AND GEOLOGY <br />+'a's ~ 1313 Sherman Street, Room 215, Denver, Colorado 80203, (303} 866-3567 <br />PROPOSED DECISION <br />for <br />Approval of Permit Renewal <br />The Colorado Division of Minerals and Geology, in accordance with C.R.S. 34-33-109(7), <br />proposes to Approve the renewal of a permit to conduct surface coal mining and reclamation <br />operations at the Sanborn Creek Mine, Permit No. C-] 981-022. <br />This decision is based on a review of the complete and accurate application and the existing permit, <br />including all conditions and revisions approved up to October 3, 2003. In accordance with C.R.S. <br />34-33-109(7)(a), the Division makes the following determinations which warrant that the permit be <br />renewed: <br />1. The terms and conditions of the valid, existing permit are being satisfactorily met; <br />2. The present surface coal mining and reclamation operation is in compliance with all <br />requirements of the Colorado Surface Coal Mining Reclamation Act, C.R.S. 34-33-101 et <br />seq., and the Regulations promulgated thereunder; <br />3. The renewal requested does not substantially jeopazdize the permittee's continuing <br />responsibility on existing permit azeas; <br />4. The operator has provided evidence that the performance bond in effect for the operation <br />will continue in full force for the proposed period of renewal as well as any additional <br />bond required; <br />5. Any additional revised or updated information as required has been provided. <br />Based on a preponderance of the evidence, the permit issued to Oxbow Mining, LLC meets the <br />requirements under the right of successive renewal. <br />The permit application will remain a binding part of the pemut. Renewal of the pemut will be for a <br />term of five (5) years. <br />I conclude that there is no basis for denying the renewal. <br />DIVISI F MINERALS AND GEOLOGY <br />Director ~ <br />C/~~e/ a Z~u~ <br />Date <br />C-RN-IS <br />
The URL can be used to link to this page
Your browser does not support the video tag.