Doc Date
10/2/2000
Doc Name
ORCHARD GROVE PIT PN 17-1990-094
From
PARKERSON CONSTRUCTION INC
To
DMG
Type & Sequence
SI1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TrucklLoader Team Wor•nt'd Task # : 007 • sheet 2 or 2 <br />. <br />Loading Tool Cvcle Time : Number of loading tool passes required to fill truck : 3 passes <br />Excavators and front shovels -machine cycle time vs. job condition rating : NA <br />-selected value within basic rating : NA <br />Track loaders • material descr.: NA <br />-cycle time elements (min.) : Load : NA Maneuver : NA Dump : 0.100 <br />Wheel and track loaders -unadjusted basic cycle time (load, maneuver, and dump) : 0.490 minutes <br />Cycle Time Factors Loading Condition Description Factor (min.) Source <br />Material : Matedal 6' and over diameter 0.030 (Cat H8) <br />Stockpile : No adjustment - /actornot applicable 0.000 (Cat HB) <br />Truck ownership : No adjustment - factornol app(ca61e 0.000 (Cat H8) <br />Operation: No adjustment-lactornot applicable 0.000 (Cat HB) <br />Dump target : Nominal target 0.000 (Cat HB) <br /> Net cycle time adjustment : 0.030 minutes <br /> Adjusted basic cycle lime : 0.520 minutes <br />Net load time per truck (bulk of frsl loader pass completed during truck exchange) : 1.140 minutes <br />Truck Cycle Time <br />Truck exchange time: 0.50 minutes........ Adjusted (or site altitude : 0.50 minutes <br />Truck load time: 1.140 minutes........ Adjusted for site altitude : 1.14 minutes <br />Truck maneuver and dump lime: 0.80 minutes........ Adjusted for site altitude : 0.80 minutes <br />Truck travel (haul 8 return) time: <br />Road condition description :Rutted dirt, IrfBe maintenance, na water, 2' Gre penefratlon <br />Haul route <br />Raad <br />seg. # Haul distance <br />leaf Grade <br />res. (%) Rolling <br />res. (%) Total <br />resistance (%) Speed <br />/eet/minute Travel time' <br />(minutes) <br />1 500 0.00 5.00 5.00 1695 0.48 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />minutes <br />first and Iut segments atljusted for acceleratioNdecelenhon <br />"4me shown inclutles aldlutle atljusVnenl <br />Return time": 0.36 minutes <br />Total truck cycle lime : 3.27 minutes <br />Loading tool unit production : 271.65 LCY/hour...... Adjusted for job efficiency : 225.47 LCY/hour <br />Truck unit production : 136.06 LCY/hour...... Adjusted for job efficiency : 112.93 LCYlhour <br />Optimal no. truckslloading tool : 2 trucks........... Selected no. lrucks8oader : 2 trucks <br /> Adjusted hourly truck team production : 225.81 LCYlhr <br /> Adjusted hourly single lruck/loader team production : 225.47 LCYRv <br /> Adjusted hourly multiple truck/loader team production : 225.47 LCY/hr <br /> <br /> <br /> <br />_.__..._.. .-r,.^ <br />-. <br />.. ,... <br />_...::_:.:.._.. .__~._.__..._ .~_..,..__.,..._.........: ~ <br /> <br /> <br />~......_c.Y.~._ <br /> <br />,. <br />_ ... . <br />OST <br />JOB TIME ANDC <br />Fleet size : 1 Team(s) Total job time : 68.36 Hours <br />Unit cost <br />_ .. : $0.668 /LCY Total job cost : $10,289 <br />,.,. ,.:. <br />... <br />.. <br />~,... .............. .~,......_~,._,..._.._. cam.. .~. ~.,..,~... ...-. ... ~ <br /> <br /> <br />.... <br />Return route : Haul time " : 0.48 <br />