My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-10-26_REVISION - M1980110
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980110
>
2007-10-26_REVISION - M1980110
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:46:05 PM
Creation date
11/21/2007 9:19:42 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980110
IBM Index Class Name
Revision
Doc Date
10/26/2007
Doc Name
Amend Appl- Updated Info.
From
Civil Resources
To
DRMS
Type & Sequence
AM5
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
214
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
In those areas where revegetation is part of the reclamation plan, the Operator will <br />revegetate the land in such a manner so as to establish a diverse, effective, and long- <br />lasting vegetative cover that is capable of self-regeneration without continued dependence <br />on irrigation or fertilizer and is at least equal in extent of cover to the natural vegetation of <br />the surrounding area. Seed will be drilled and mulched. <br />The revegetation seeding and plant list on the Reclamation Plan Map contains the <br />preferred species of grasses, shrubs and trees to be planted. <br />Seeding will take place once final grading and replacement of topsoil have been completed <br />for each phase. Timing of seeding will be consistent with standard horticultural practice for <br />dryland applications -generally between late September and the middle of April to ensure <br />there is adequate moisture for germination. <br />(e) A plan or schedule indicating how and when reclamation will be implemented. <br />Include: <br />i. An estimate of the periods of time which will be required for the various stages or <br />phases of reclamation. <br />Please refer to the Timetable for Mining and Reclamation in Section (e) of Exhibit D. <br />ii. A description of the size and location of each area to be reclaimed during each <br />phase. <br />Please refer to the Reclamation Plan Map (Exhibit F). <br />iii. Outlining the sequence in which each stage or phase of reclamation wi116e carried <br />out. <br />Please refer to the Timetable for Mining and Reclamation in Section (e) of Exhibit D. <br />(Q A description of: <br />i. Final grading -maximum anticipated slope gradient or expected ranges thereof; <br />The finished slopes of the reservoirs will be 3 horizontal to 1 vertical. <br />ii. Seeding -types, mixtures, quantities and time of application; <br />Please refer to the Reclamation Plan Map for the list of plant materials and seeds to be <br />utilized. The operator will seed during the appropriate season to ensure adequate <br />moisture for germination and implement weed controls to allow the grasses to successfully <br />establish. Additional plantings may be installed once the reservoirs are full of water and <br />the grasses are established. <br />iii. Fertilization -types, mixtures, quantities, and time of application; <br />The type and application rate of fertilizer shall be determined based on a soil test at the <br />time of final reclamation. <br />Hall-Irwin Corporation -Long Resource - MLRB 112 Permit Application <br />Exhibit E - 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.