Laserfiche WebLink
~, . <br />Appendix A <br />Re: Trapper Mining Inc., Permit No. C-81-010, Technical Revision TR-98: Revise <br />Topsoil Stripping Area in G pit and Z pit; Revise Mining Limits in G pit and Z pit,' <br />Modify Road Locations:, <br />Added Reclamation Liability associated with the above referenced revision: <br />Topsoil Replacement Costs $ 78,027 <br />Revegetation Costs $ 18,931 <br />Backfilling and Grading $220,365 <br />Road Rearade $ 7.550 <br />Total Direct $324,873 <br />Indirect Costs (@ 17.8%) $ 57,832 <br />Grand Total $382,705 <br />