Laserfiche WebLink
.~f <br />999 <br />WESTERN SLOPE CARBON, iNC. <br />HAWKS NEST MINE <br />06 May 1988 <br />Ms. Susan Maaty <br />Reclamation Specialist <br />State of Colorado <br />Mined Land Reclamation Division <br />1313 Sherman Street <br />Denver, ~ 80203 <br />Dear Ms. Mowry: <br />MAY 1~ 198 <br />M1NED LANL <br />RECLAMATION DiviSiOrl <br />Please find the responses to the questions and cam~ents naT+aining to the <br />application of the renewal of the Hawk's Nest Mines' mining and reclamation <br />permit. <br />Question #3 -The intake shaft east of the Fast Mine is still proposed to <br />be built when mining recrntrences. <br />Question #4 -Enclosed is a map showing the enlarged Norris Pond. ,~~ <br />Question #5 -Enclosed is the slurry and water lines marked on the <br />facilities map. <br />Question #6 -There is no bleeder portal. <br />Question #7 -The west mine portals are sealed with explosive proof seals at <br />approximately 60 to 70 feet inside the mine. The seals are 30 <br />feet out by the first cross cuts. They are built of solid <br />cinder blocks and are 16" thick. <br />Question #8 -Enclosed is a revised sampling narrative showing deletion of <br />water i[nnitaring of Crystal Meadows. <br />Question #9 -Enclosed are cross-sectional drawings of how the east mine portals <br />will be done. They will be done in the same way as the west mine <br />was done. <br />Question#10 - No baffle has been installed as we did not feel that it was <br />necessary at this time. <br />MINE OFFICE <br />BOMERBET,COLORADOB1l71 <br />7Q181BbB15 <br />CORPORATE OFFICE <br />JOPLIN, MISBOUR161B07 <br />P.O. BO%7018 <br />11]-0]SOT00 <br />