Laserfiche WebLink
~s~mV@, ~Sdr~ZTai~. i&~ar~a~as <br />• <br />~O1 <br />P.O. Boz 1887, 70Z Gregg Drive, BYana Yista, CO 81211 <br />Pfo, 17191 195-3790 Faz 17191 795-9794 <br />V1A FAX <br />n~.n rx~uu~i~ <br />To: Climax Molybdenur Company <br />19302 CR 3 <br />Parshall, CO 80x68 <br />303-569-3221 ext. 2218 970-725-0038 (fax) <br />;.ttn: Michael D. Ley <br />Subject Seep Dam #3 channel revision. <br />November 9, 2000 <br />As requested, ACA °roduc5 is submitting an estimate to winterize and complete the seep dam <br />#3 project in the summer of 2001. The quantities, as you know, are estimates and tha final <br />quantities will be agreed upon by you, Nick or Tm. <br />The winterization of the project will include: placement and compaction of the sc::r. :.:ke, <br />placement of Jersey barriers around the oioeline cleanouts, pn~sure testing the 10" lines, <br />complete /ensure drainage of near ditch to the inlet structure, buttress the east bank of the <br />collection ditch to prevent sloughing, install a small coffer dam in the collection channel to protect <br />the pipeline from silt. We will try to line the south pond collection channel to completion if the <br />weather holds out. We will also excavate for insoeCion the base of decant tower number 5. <br />I have included a dewatering cost for the North pond if necessary, but ii we use the 5 decant <br />tower line this should not be necessary. <br />The attached page shows the cost to complete this year and the costs to complete the project in <br />2001. <br />If you have any questions please call me at (719) 395-3790. <br />Sincere~l , <br />~!Z(,l~C~ 7~~ <br />Chuck Murphy <br />General Manager <br />Post-iC Fax Note 7671 Di1o~ 0 P,jAe- <br />To Fan //~ <br />/-t <br />~ <br />1 <br />eo~oepr. n l~r-1! `~~ C P s <br />- <br />Phonc • ~ Phone tl <br />Festl ~ X003 Faetl <br />RECEIVED TIME NOV. 9. 10~4HAM PRINT TIME NOV. 9. 10~49HM~~ <br />