Laserfiche WebLink
Oxbow Mining, 1 1 r'- Tirhnrrat Rcairi°n 7843 <br />11 IVat Caa/Before Facility <br />ferbniral Adegnary C°mmnul Re. p°nnf <br />.September 5, 7003 <br />Yage fi <br />The ore of keyway tuts to stabilize the fill was not noted in the application. Please include in the rert~ed derign report <br />the use of keyway tuk on slopes steeper than 36%. <br />Please have the stability analyser of Appendix C of the Environmental.Strateger Corporation rerti~ed by a registered <br />engineer. <br />Response: The ESC design report has been revised to include specifications for any required <br />keyways and coal refuse placement and compaction. As previously noted in the response to <br />Comment 17, appropriate certification is provided in this response package for the ESC design report. <br />Copies of the revised design information accompany these responses for replacement in the Mining <br />and Reclamation Plan document. <br />56) Please include in the application a certified derign, to the requirements of Rule 4.09.2(2), for the proposed <br />rubdrainage ryltem of the proposed II Wert Coal Refuse Facility. Please include this portion of the derign in the certified <br />derign report of the structure. <br />Res onse: A sepazate certified underdrain design report has been developed for inclusion in Exhibit <br />2.05-E4. Copies of this supplemental design information accompany these responses For replacement <br />in the Mining and Reclamation Plan document. <br />57J Please include in the certified derign report the rpeeiftratianr of Rule 4.09.2(3). <br />Response: The permit text and ESC design report have been reviewed and revised, as appropriate to <br />address the applicable regulatory requirements. Statements cross-referencing the relevant <br />requirements have been incorporated into both the permit text and the ESC design report. Copies of <br />the revised information accompany these responses for replacement in the Mining and Reclamation <br />Plan document. <br />58J Please modify the ftnirhed top surface of the proposed 77 Wert Caal Refuse Facility (Drawing 2.05-M1 Sheet 5 of <br />SJ into a mound or tent-like surface (presently a Ieve1 rutfaceJ that sheds frugeert a 3% grade) water to the perimeter <br />ditcher m lieu of over the outrlape of the fell ar per Rrr1e 4.09.2(5). <br />Response: The surface of the fmal bench (elevation 6,250') will be sloped at approximately 2-3 <br />percent (o the west to drain to the permanent diversion ditch IIW-1. Maps 2.05-M1 (Sheet 5 of 5), <br />2.05-M4 (Sheet 5 of 5), and 2.05-M6 (Sheet 5 of 5) have been revised to reflect the drainage gradient. <br />Copies of the revised maps accompany these responses for. replacement in the Mining and <br />Reclamation Plan document. <br />59J Please include the drainage designs that demonstrate comp/ionic with the nyuirementr of Rule 4.09.2(7) in the II <br />lYlest Coal Refute Facility certified derign report. <br />Res onse: Please refer to previous response to Comment 52. <br />