Laserfiche WebLink
r <br />Mr. Mark Steen <br />-2- <br />August 29, 1985 <br />4. We are n~t completely certain what the intended slope gradient of the <br />J tailings pond will be after reading the last paragraph of Page 13 <br />~r~ (which references a 1.5H:1V slope) and the last paragraph on page 14 <br />~. which continues to page 15 (which specifies a 2.8H:1V slope). Please <br />clarify this confusion. <br />~ ~~ <br />5. Will any surface activity be done at the Columbus Mine area? If so, <br />please add this area into the permit. <br />6. We could find no reference to proposed activities at the Bellevue Mine <br />and or the Bellevue Dump. Are any activities proposed? If so, please <br />discuss them. <br />What are the drainage ditches designed for (10 year-24 hour event)? <br />,Exhibit D -Water Resources <br />A copy of this application was forwarded to the Division of Water Resources <br />for their review. We will forward their review once received. <br />Exhibit E -Reclamation Plan <br />/l. The Division applauds the operator for having the foresight to put in <br />a test plot. We would be very interested i,n obtaining a copy of the <br />/ findings from this plot. <br />2. If there is a change in the proposed seed mixture, it wil] be <br />necessary to advise the Division. <br />Other <br />/1. Please provide proof of newspaper notification (the publisher's affidavit <br />is acceptable). <br />• 22. Please provide proof of landowner notification. <br />/3. P]ease provide proof that a copy of this application was placed with the <br />jurisdictional BLM office and with the Boulder County Clerk and Recorders <br />Office. <br />/. Please execute the enclosed Performance Warranty form for the entire site. <br />Contact this office if you have any questions. <br />PVOC/mis <br />Enclosure(s) <br />3057E <br />Reclamation Specialist <br />