Laserfiche WebLink
~~ <br />Mr. Ron Thomspon 2 July 23, 1992 <br />1. Please state how long you intend to leave the topsoil in a stockpile. If this <br />time is long, will the topsoil stockpiles be seeded? <br />2. Under "Sealing and Plugging of Drill Holes" it is stated that for drill holes <br />which encounter appreciable amounts of groundwater, cement will be <br />poured through the uppermost water bearing horizon. Regulation 4.07.3(2) <br />requires that the grout extend "20 feet above and below the water bearing <br />zone". Please commit Basin Resources to this. <br />If you have any further questions, please call me. <br />Sincerely, <br />,~~~~r~ ~ <br />Joe J. Dudash <br />Reclamation Specialist <br />JJD/yjb <br />cc: Dan Hernandez <br />M:\oss\yjb\bsn.ltr <br />