My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV04185
DRMS
>
Back File Migration
>
Revision
>
REV04185
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:02:13 AM
Creation date
11/21/2007 9:15:34 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Revision
Doc Date
4/7/2006
Doc Name
Response & Comments (E-mail)
From
Tom Kaldenbach
To
Dan Mathews
Type & Sequence
PR10
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
112. a) The Division has reviewed the revised Map 66. l he mapping appear w ~ n,...y,..... . ............_...__ <br />that the extent and location of agriculttual activity in the alluvial valleys w7thin the reconnaissance area <br />- - is not significantly changed from that depicted in the 1984 mapping. Based on review of the updated <br />mapping, application narrative, and the most recent findings document, it would appeaz that the alluvial <br />deposits on the North Fork of the Gunnison downstream from Gribble Gulch constitute an AVF. It also ~~ <br />appears that an AVF occurs within the alluvial deposits of the main stem of Minnesota Creek from the <br />north section tine of Section 17, TI4S, R90 W, downstream to the North Fork of the Gunnison. Finally, <br />it appears than an AVF occurs on the lower East Fork of Minnesota Creek, from the upper limit of <br />mapped alluvial deposits in Section 9, T14S, R90W, to its confluence with the main stem Minnesota <br />Creek. PIease comment ifyou have questions or disagree with this determination. <br />b) Please amend page 2.06-5 to discuss the fact that the reconnaissance investigation was reviewed and pf~ <br />updated in 2005 in association with PR-10, and that Map 66 was updated as a result <br />MCC Response: MCC concurs with the division's interpretation ojthe updated Mop 66.:V1CC also <br />changed Tab/e 66 in Section 1.06 to reflect updated salinity information during the irrigation season. <br />114. Remaining items from this comment are being addressed in comments 86 a-e and 111. Drah <br />MCC Response: Mountain Coat Company has developed preventive measures, conducted <br />geotechnical, and seismic evaluations, ojMonument Reservoir Thu injormatian is contained in the <br />text under the Subsidence Section and Exhibits 72 and 74. <br />116. It appears the revised materials referenced in your cover letter of June 13, 2005 were inadvertently not pr''~ <br />included in the submittal. Please submit the revised materials. <br />:ti1'CC Response: Further discussions with the Division were conducted and the information was sent <br />via a-mail to Mr. Dan Mathews of the Gra»d Junction OJrce. The information provided to 1Nr. <br />Mathews appear to be sufficient and is included with this submittal <br />116a. It appears the revised page 2.06-11 referenced in your cover letter of June 13, 2005 was inadvertently not ~N <br />included in the submittal. Please submit the revised page 2.06-I 1. <br />11'ICC Response: Further discussions with the Division were conducted and the information was sent <br />via a-matt to Mr. Dan Mathews ojthe Grand Junction Office. The information provided to 1Vfr. <br />:Ytathews appeared to be sufficient and is included with this submittal <br />120. Please add to the permit application a description of the monitoring locations proposed on"all alluvial.pTM <br />valley floors" as required by Rule 4.24.4. Please include monitoring locations, parameters, and <br />frequencies. <br />:tiICCResponse: MCC has monitoring stations located upstream and downstream on the North Fork <br />ojthe Gunnison River and on :Yfinnesota Creek The information is provided to the Division on an <br />annual basis by submittal ojthe Annual Hydrology Reports. The monitoring plan is provided in <br />Exhibit 71, for the South of Divide area The monitoring on the North Fork ojthe Gunnison River is <br />outlined in Section 2.05. <br />P O Bax 591 ~ 5174 Highway 133 ~ Somerset, CO 61433 <br />(970)929.5015 <br />
The URL can be used to link to this page
Your browser does not support the video tag.