My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV04181
DRMS
>
Back File Migration
>
Revision
>
REV04181
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:02:13 AM
Creation date
11/21/2007 9:15:32 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981047
IBM Index Class Name
Revision
Doc Date
1/6/1998
Doc Name
BLUE RIBBON MINE PN C-81-047 PERMIT RENEWAL APPLICATION 3
From
DMG
To
DELTA CNTY CLERK AND RECORDER
Type & Sequence
RN3
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~~ <br />~p'`~~~ COLORADO DIVISION OF MINERALS AND GEOLOGY <br />~•,~~~;' 1313 Sherman S[reet, Room 215, Denver, Colorado 80203, (303) 866-3567 <br />PROPOSED DECISION <br />for <br />Approval of Permit Renewal <br />The Colorado Division of Minerals and Geology, in accordance with C.R.S. 34-33-109(7), <br />proposes to approve the renewal of a permit to conduct surface coal mining and reclamation <br />operations at the Blue Ribbon Mine, Permit No. C-81-047. <br />This decision is based on a review of the complete and accurate application and the existing <br />permit, including all conditions and revisions approved up to December 9, 1997. In accordance <br />with C.R.S. 34-33-109(7xa), the Division makes the following determinations which warrant that <br />the permit be renewed: <br />1. The terms and conditions of the valid, existing permit are being satisfactorily <br />met; <br />2. The present surface coal mining and reclamation operation is in compliance <br />with all requirements of the Colorado Surface Coal Mining Reclamation Act, <br />C.R.S. 34-33-101 et seq., and the Regulations promulgated thereunder; <br />3. The renewal requested does not substantially jeopardize the permittee's <br />continuing responsibility on existing permit areas; <br />4. The operator has provided evidence that the performance bond in effect for <br />the operation will continue in full force for the proposed period of renewal <br />as well as any additional bond required; <br />5. Any additional revised or updated information as required has been <br />provided. <br />Based on a preponderance of the evidence, the permit issued to MINREC, Inc. meets the <br />requirements under the right of successive renewal. <br />The permit application will remain a binding part of the permit. Renewal of the permit will be <br />for a term of five (5) years. <br />1 conclude that there is no basis for denying the renewal. <br />DIVISION OF MINERALS AND GEOLOGY <br />~~~q~ <br />Director Date M:~OSSURCITEMNCRNIS0a7.W1C <br />
The URL can be used to link to this page
Your browser does not support the video tag.