My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV04176
DRMS
>
Back File Migration
>
Revision
>
REV04176
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:02:13 AM
Creation date
11/21/2007 9:15:31 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977342
IBM Index Class Name
Revision
Doc Date
2/12/2004
Doc Name
TR14 Submittal
From
Climax Molybdenum Company
To
DMG
Type & Sequence
TR14
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
For your information, I have enclosed design drawings for the Mill Water Return Line <br />Project. Much of the pipeline right-of--way has already been cleared of timber during our <br />past beetle control logging effort. The pipeline will mostly follow our existing upper <br />tailing road or future upper intercept canal road. The short section of pipeline and road <br />between the tailing pond and the upper tailing road will be dual purpose, also serving as <br />the haul road to the south topsoil stockpile. The access road along the pipeline is designed <br />to be a temporary/minimally traveled road. Areas that were used for log decking locations <br />will be utilized as staging areas for fusing and storing pipe and bedding materials. <br />Henderson is planning to complete this project as presented in the enclosed drawings and <br />specifications. Work is scheduled to begin after snowmelt this spring. The project is <br />expected to take one field season to complete. Work in other areas of the overall project <br />to replace Henderson's current mill water return system will be presented to the Division <br />in the future as needed. <br />Enclosed is one copy of the project design drawings, one copy of the technical <br />construction specifications, arevised Henderson Mill Tailing Pond Hydrology Report by <br />W.W. Wheeler, and a check covering the required technical revision fee. <br />Please feel free to call if you have any questions or are in need of any further information. <br />1 can be reached at (303) 569-3221 ext. 2214. <br />Very t~rul~y~yours, <br />Erich Bower <br />Environmental Engineer <br />Climax Molybdenum Company <br />Enclosures <br />Cc: MitchLapp-Climax <br />Anne Beierle -Climax <br />Rich Wagner-Climax <br />Dave Long-Climax <br />Kurt Keskimaki -Climax <br />
The URL can be used to link to this page
Your browser does not support the video tag.