My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV04151
DRMS
>
Back File Migration
>
Revision
>
REV04151
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:02:11 AM
Creation date
11/21/2007 9:15:25 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977247
IBM Index Class Name
Revision
Doc Date
10/21/1996
Doc Name
TRANSFER OF PERMIT AND SUCCESSION OF OPERATORS APPLICATION FORM
Type & Sequence
SO2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />.; iiiii~iiiiiiiiiiii~ • <br />__. <br />• <br />TRANSFER OF PERMIT AND SUCCESSION OF OPERATORS ~ EC EIVE® <br />APPLICATION FORM <br />ocr Z 1 1996 <br />,; <br />The application for a Transfer of Permit and Succession of Operator.&r~mus~Gimebl4aluQ016yyr <br />(4) major parts: 1) an Application Form; 2) an Application Fee; 3> a Performance <br />Warranty (attached as part of the Application Package> bearing the original notarized <br />signature of the Successor Operator; and, 4) a replacement Financial Warranty provided <br />by the Successor Operator, bearing an original notarized signature. 7o expedite <br />processing, please provide the information in the format and order described below. <br />[. FINANCIAL WARRANTY INFORMATION (Choose ONE option>: <br />1. Option A: _l0/15 96 I wish to WAIVE MY RIGHT to a 30-day <br />(Initial & Date) processing time to allow the Division of <br />Minerals and Geology to recalculate the <br />Financial Warranty requirements. <br />2. Option B: I DO NOT WISH TO WAIVE MY RIGHT to a <br />(Initial & Date) 30-day processing time. I hereby submit a <br />replacement Financial Warranty for the same <br />dollar amount as the Financial Warranty <br />maintained by the current operator. I <br />understand that the Division of Minerals and <br />Geology will recalculate the required <br />reclamation bond within 60-days from the <br />decision date and the required FINANCIAL <br />WARRANTY COULD BE SUBSTANTIALLY INCREASED at <br />that time. As the new operator, I agree to <br />be responsible for posting any required <br />_ increase to the financial warranty for good <br />cause shown, in a form acceptable to the <br />Board, xithin 60-days of such notice. <br />~e <br />
The URL can be used to link to this page
Your browser does not support the video tag.