Laserfiche WebLink
J. E. STOVER 8~ ASSOCIATES <br />2768 COMPASS DRIVE, SUITE 101 <br />GRAND JUNCTION, COLORADO 81506 <br />PHONE: (970) 245-4101, FAX 242-7908 <br />MINE ENGINEERING <br />MINE RECLAMATION <br />February 16, 1998 <br />Michael Boulay <br />Division of Minerals & Geology <br />- - 1313 Sherman St., Room 215-- <br />Denver. CO 80203 <br />Re: Bear Coal Company <br />Technical Revision 25 <br />Permit C-81-033 <br />Dear Mr. Boulay: <br />iii iiiiiiiiiiiii iii <br />sss <br />CIVIL ENGINEERING <br />CONST. MANAGEMENT <br />RECEIVED <br />FEB 19 1998 <br />Division of Minerals ~ Geobgy <br />Technical revision no. 25 was submitted to provide for the construction of a mine water <br />treatment pond. Item number one of the DMG's December 12"' adequacy response is <br />concerned with the active slide. Since the slide and its stability are currently being <br />investigated and analyzed by the DMG, Bear has decided to temporarily suspend its plan <br />to construct a mine water treatment pond. Please withdraw technical revision no. 25 from <br />further consideration. <br />Please call if you have any questions. <br />Sincerely, <br />~f ~~~ <br />J. E. Stover, P.E. <br />Consulting Engineer <br />cc: Bear Coal Company <br />