Laserfiche WebLink
1 <br /> <br />EXHIBIT G <br />The only water to be used on the project will be during the <br />' mining stage. During the mining stage water will be used on the <br />' roads and pit floor to control dust and on the spray bar system <br />of the crushing operation. During extreme wind conditions, <br />1 Asphalt Paving Company shuts down its entire operation. <br />Asphalt's estimate of the project water required is an <br />average of 17 acre feet annually with a maximum daily use of <br />30,000 gallons on extremely poor weather condition days. <br />1 <br /> <br /> <br />1 <br />I1 <br /> <br /> <br />1 <br /> <br />1 <br /> <br /> <br /> <br />~i <br />