Laserfiche WebLink
1 <br />EXHIBIT E (Cont'd) <br /> <br />1 <br /> <br />i <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />1 <br /> <br /> <br /> <br /> <br /> <br />Need control may be necessary, but not much evidence of this <br />being a problem is present. Weed control would have to be done <br />with great care for most herbicides would kill the shrubs as well <br />as the weeds. <br />Protection from grazing pressures would be essential during <br />the first two or three years. If this is not done, the vegeta- <br />tion may be seriously harmed, if not destroyed, and the entire <br />revegetation would need to be done again. <br />Reclamation Timetable <br />The reclamation phases listed below <br />may be correlated to map Exhibit F. The phases correspond to the <br />mining in Exhibit D-1 and are numbered accordingly. Note that <br />these are estimates only and that times may vary radically <br />depending on market, weather and the general economy. <br /> RECLAIv1ATION TISSETABLE <br /> Total Road Total Acres + <br />Phase Years Acres± Acres± To Revegetate <br />I 4 to 6 28.24 0.53 27.71 <br />II 14.78 0 14.78 <br />III 10.73 0 10.73 <br />IV 9.40 0 9.40 <br />V 4 to 6 9.07 0 9.07 <br />VI 9.00 0 9.00 <br />VII 10.31 0 10.31 <br />VIII 9.09 0 9.09 <br />IX 9.54 0 9.54 <br />X 9.34 0 9.34 <br />XI 12.27 0 12.27 <br />XII 4 to 6 7.85 0 7.85 <br />XIII 8.31 0 8.31 <br />XIV 15.33 0 15.33 <br />P 35.15 1.50 33.65 <br />R Complete 9.00 0 Complete <br />Totals 207.41 2.03 196.38 <br />7Q <br />