My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV03994
DRMS
>
Back File Migration
>
Revision
>
REV03994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:02:00 AM
Creation date
11/21/2007 9:13:54 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980006
IBM Index Class Name
Revision
Doc Date
11/28/2005
Doc Name
Preliminary AdequacyReview Letter & Cost Summary
From
DMG
To
Kerr Coal Company
Type & Sequence
RN5
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 005 <br />Date : 1123/2005 <br />User : JHB <br />State :Colorado <br />County :Jackson <br />Site :Marc Mine <br />PermiUjob# : C-80-006 <br />Abbreviation :none <br />Filename :0006-005 <br />Agency or organization name :Colorado Division Of Minerals And Ge <br />Permit or other job action : RN5 2005 <br />Task description :Backfill and Regrade Pond F <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D8R Series 11 - 8SU Horsepower 310 <br />Blade type :Semi-Universal <br />Attachment no. 1 :ROPS Cab Shift basis : 1 perday <br />Attachment no. 2 :3-shank ripper <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cost/hour : $48.82 NA <br />Operating cosUhour : $66.09 100 <br />Ripper op. cosUhour : $0.00 0 <br />Operator cosUhour : $31.78 NA <br />Total unit cosUhour : $146.70 Total fleet cosUhour : $146.70 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 5,850 CCY factor : 1.125 volume : 8,581 LCY <br /> <br />Source of estimated volume :Permit Volume 12, Page 33R <br />Source of estimated swell factor :CAT Handbook <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br />Average push distance : 150 feet <br />Unadjusted hourly production : 634.3 LCY/hr <br />Material consistency description <br />Compacted fill or embankment <br />Average push gradient : 0.00 % Q <br />Average site altitude : 8,200 feet <br />Material weight : 2,650 Ibs/LCY <br />Weight description <br />Decomposed rock - 25% Rock, 75% Earth <br />Operator skill : 0.75 <br />Material wnsistency : 0.90 <br />Dozing method : 1.00 <br />Visibility : 1.00 <br />Job efficiency : 0.83 <br />Spoil pile : 0.60 <br />Push gradient : 1.00 <br />Altitude : 1.00 <br />Material weight : 0.87 <br />Blade type : 1.00 <br />Net correction : 0.29 <br />Adjusted unit production : 184.99 LCY/hr <br />Adjusted fleet production : 184.99 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) Total job time : 35.58 Hours <br />Unit cost : $0.793 /LCY Total job cost : $5,219 <br />
The URL can be used to link to this page
Your browser does not support the video tag.