Laserfiche WebLink
,: <. <br />.. ,:,. <br />_..:, ,: <br />ROADABLE EQUIPMENT sheet 2 of 2 <br /> Nearest major city or town within project area region : Walden <br />Transportation Cvcle Time : Non- Total one-way travel distance : 10.0 miles <br /> Roadable Roadable Average travel speed : 35.0 mph <br /> Equipment Equipment <br />Haul time (hours) = 0.29 0.29 Total non-roadable mob/demob cost' : $1,242.86 <br />Return time (hours) = 0.29 0.29 ' bro rountl tops with haul rig <br />Loading time (hours) = 2.50 NA Total roadable mob/demob cost": $0.00 <br />Unloading time (hours) = 2.50 NA '• one round trip, no haul rig <br />Subtotals = 5.57 0.57 <br />JOB TIME AND COST Total job time : 11.14 hours <br /> Total job cost : $1,243 <br />EQUIPMENT HAUL DISTANCE and TIME <br />