Laserfiche WebLink
ROADABLE EQUIPMENT sheet 2 of 2 <br />Machine Total Fleet Size Haul Trip Return Trip <br />Description CosUhour/unit (No. units) CosUhrlfleet Cost/hr/fleet <br />-Flatbed Truck, 6x4, 45K GVW $87.29 1 $87.29 $87.29 <br />-Light Duty Pickup, 4x4, 1 T $37.28 1 $37.28 $37.28 <br />Subtotals : 8124.57 8124.57 <br />EQUIPMENT HAUL DISTANCE and TIME <br /> Nearest major city or town within project area region : Kremmling <br />Transportation Cvcle Time : Non- Total one-way travel distance : 75.0 miles <br /> Roadable Roadable Average travel speed : 45.0 mph <br /> Equipment Equipment <br />Haul time (hours) = 1.67 1.67 Total non-roadable mob/demob cost' : $5,559.91 <br />Return time (hours) = 1.67 1.67 • two round tdps with haul dg <br />Loading time (hours) = 0.75 NA Total roadable mob/demob cost": $415.23 <br />Unloading time (hours) = 0.75 NA "one round tnp, no haul rig <br />Subtotals = 4.83 3.33 <br /> <br /> <br />< <br />JOB TIME AND COST ,. <br /> <br />Total job time : <br />;:. <br />9.66 hours <br /> Total job cost : $5.975 <br />