My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV03994
DRMS
>
Back File Migration
>
Revision
>
REV03994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:02:00 AM
Creation date
11/21/2007 9:13:54 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980006
IBM Index Class Name
Revision
Doc Date
11/28/2005
Doc Name
Preliminary AdequacyReview Letter & Cost Summary
From
DMG
To
Kerr Coal Company
Type & Sequence
RN5
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ROADABLE EQUIPMENT sheet 2 of 2 <br />Machine Total Fleet Size Haul Trip Return Trip <br />Description CosUhour/unit (No. units) CosUhrlfleet Cost/hr/fleet <br />-Flatbed Truck, 6x4, 45K GVW $87.29 1 $87.29 $87.29 <br />-Light Duty Pickup, 4x4, 1 T $37.28 1 $37.28 $37.28 <br />Subtotals : 8124.57 8124.57 <br />EQUIPMENT HAUL DISTANCE and TIME <br /> Nearest major city or town within project area region : Kremmling <br />Transportation Cvcle Time : Non- Total one-way travel distance : 75.0 miles <br /> Roadable Roadable Average travel speed : 45.0 mph <br /> Equipment Equipment <br />Haul time (hours) = 1.67 1.67 Total non-roadable mob/demob cost' : $5,559.91 <br />Return time (hours) = 1.67 1.67 • two round tdps with haul dg <br />Loading time (hours) = 0.75 NA Total roadable mob/demob cost": $415.23 <br />Unloading time (hours) = 0.75 NA "one round tnp, no haul rig <br />Subtotals = 4.83 3.33 <br /> <br /> <br />< <br />JOB TIME AND COST ,. <br /> <br />Total job time : <br />;:. <br />9.66 hours <br /> Total job cost : $5.975 <br />
The URL can be used to link to this page
Your browser does not support the video tag.