Laserfiche WebLink
sheet 1 of 2 <br />CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # <br />Date <br />User <br />Agency or organization name :Colorado Division Of Minerals And Geology <br />011 State :Colorado PermiUjob # : C-80-008 <br />1123/2005 County :Jackson Abbreviation :none <br />JHB Site :MarrMine Filename:0006-011 <br />Permit or other job action : Rn5 2005 <br />Task description :Replace Topsoil from Stockpile to Pond F <br />,::.: <br />HOURLY EQUIPMENT COST <br />Shift basis : 1 per day <br />Cost Bre <br />Scraper work team -Scraper :Cat 621G <br />-Push dozer :NA <br />Support equipment-Load area :NA <br />-Dump area : A <br />Road maintenance -Motor grader :NA <br />-Water truck :NA <br />akdown : Scraper Work Team <br />Scraper Dozer Support Equipment <br />Load area Dump area Road Maintenance Equipment <br />Grader Water truck <br />Import data filename : scrape2 NA NA NA NA NA <br />Utilization-machine : 100 NA NA NA NA NA <br />-Ripper attachment : NA NA NA NA NA NA <br />Ownerhip cosUhour : $37.06 NA NA NA NA NA <br />Operating cosUhour : $79.46 NA NA NA NA NA <br />Ripper op. cosUhour : NA NA NA NA NA NA <br />Operator cost/hour : $32.15 NA NA NA NA NA <br />Unit subtotals : $148.68 NA NA NA NA NA <br />Number of units : 1 0 0 0 0 0 <br />Group subtotals : Work : $148.68 Support : $0.00 Maintenance : $0.00 <br />Total work team cosVhour : $148.68 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 2,450 CCY <br />factor : 1.125 volume : 2,756 LCY <br />Source of quantity take-off :Permit Volume 12, Page 31R <br />Source of estimated swell factor :CAT Handbook <br />