• ,~
<br />Mr. Forrest Luke -2- September 8, 1995
<br />Trapper Mining Inc.
<br />The Division requests that Trapper Mining Inc. provide a map showing estimated locations of
<br />the mature shrub transplant in the Annual Reclamation Reports. This will allow the Division to
<br />review the spatial distribution of the transplant areas.
<br />2. According to the 1994 Annual Reclamation Report, Table 4.9-4, at the end of the current
<br />permit term, 1993-97, Trapper Mining Inc. will have an excess of 1,097,028 cubic yards of
<br />topsoil. What does Trapper Mining Inc. plan to do with the surplus topsoil?
<br />NO
<br />,,,,t~Q Rule 4.06.1(2) states that topsoil shall be immediately redistributed or stockpiled pending
<br />„[~„, redistribution. Rule 4.06.3(1) addresses stockpile storage of topsoil with intention to
<br />1'~'-` redistribute the material on regraded azeas. Trapper Mining Inc. needs to submit a plan to the
<br />Division that addresses redistribution of the surplus topsoil.
<br />Section 2.0. 1994 Annual Hydrolog~Reoort
<br />Surface Water Hydrology
<br />~ k 3 On page 4-1, it is stated that NPDES sites 001, 002, 005, 006, 011 and 013 were active during
<br />~ ° ~' "` 994. However, there are no data provided for NPDES site 005 in Table C-l, pages C-18
<br />B"b` y~~ through C-21. Please provide the hydrology data for NPDES site 005, if available.
<br />Ok 4. On page 5-1, it is stated that samples were collected for water quality analyses from active sites
<br />o131~Ru>'des X51, 001, 002, 006, 011 and 013 in 1994. However, there aze no data for site 013 in Table C-1,
<br />O~f~A'~SC lu Alnk
<br />' p„r ~0 4~:~knarc pages C-22 and C-23. If available, please provide this data.
<br />I~ MA y FoR F~na S~~iE
<br />O ~~µ~ . ,For the sake of clarification, please add "no discharge" and a corresponding date for those
<br />~ppf p„ .,, sF~,,JSampling dates when there were no discharges.
<br />ra p
<br />~ 6. On page 5-1, it is stated that there are eight pages of water quality data in Table C-1.
<br />p{~ However, Table C-1 covers only seven pages, C-18 through C-24. Is one page missing? If so,
<br />o.~-, ~$~~°' please provide the missing page.
<br />ok ~~ 7. On page 4-241c of the permit application, in Table 4.8-12a approved on 4/14/93 in Minor
<br />~= i ~ ~ Revision No. 123, selenium, total, is listed as a required pazameter in List A-3 (semi-annual).
<br />S~ Qy~aQ~~However, selenium does not appear in Table C-1 of the Annual Report. Please clarify.
<br />~. `r"~
<br />8. There does not appear to be any data or discussion of the WET testing for NPDES sites 002,
<br />~ ~ 003, 005, 006, 009 and Ol 1. Because of the importance of WET testing, please provide WET
<br />~' `~`!~ ~ to i data or summation of data, and an appropriate discussion of the results.
<br />~~1~ s~~ool, oo'~.-l006~ a13
<br />~y.~ 9. Please provide an analysis, pursuant to Rule 2.05.6(3)(b)(iii), of the surface water quality and
<br />~~a L quantity data presented in the 1994 AHR, showing whether the data supports or does not
<br />Ot"_" . 6 ~Z
<br />
|