Laserfiche WebLink
<br /> <br /> <br /> <br />-page2- <br />reanalyze several critical cross sections of the redesigned access road <br />alinement. The report presents numerous recommendations concerning <br />construction specifications and methodology which it believes should be <br />implemented to ensure stability of the fill and the haul road. If these <br />recommendations are adhered to, including appropriate inspection and <br />supervision by qualified geotechnical professional, the pile and road should be <br />stable. OXBOW has committed to the implementation of the recommendations <br />of Lincoln-Devore, Inc. <br />