<br />INSERTION INSTRUCTIONS
<br />SENECA II-W PERMIT C-82-057
<br />Technical Revision - 40
<br />Jttly z7, zool
<br />The following materials are to be inserted into the permit document after the technical revision has
<br />been approved.
<br />Volume 5, Tab 9 -Soil Baseline Studv
<br />1. Replace the existing Exhibit 9-3, Soil Survey Map, with revised exhibit.
<br />Volume 6, Tab 10 - Vegetation
<br />1. Test -replace existing page 44, Table 10-7, with revised page 44.
<br />2. Replace existing Exhibit ]0-3, Pre-mining V egetation Types & Sample Locations, with revised
<br />exhibit.
<br />Volume 7a, Tab ]3 -Facilities
<br />1. Attachment 13-SB, Drainage and Sediment Control Plan, replace all existing SEDCAD runs for
<br />Pond 16 with new SEDCAD runs.
<br />2. Text -replace existing Figure 1, Postmine Channel Designs, with revised Figure 1, Postmine
<br />Channel Designs.
<br />3. Attachment 13-5B, Appendix 3, replace existing PM2 Upper, PM2 Lower, and PM2A with PM-
<br />2, PM-2A and PM3.
<br />Volume S, Tab 13 -Facilities
<br />]. Replace existing Exhibit 13-SA, Pond O1G Watershed Map, with revise exhibit.
<br />Volume 12, Tab 19 -Reclamation Schedule
<br />1. Text -replace existing Table 19-1, Projected Reclamation Schedule, with revised table.
<br />2. Replace existing Exhibit 19-1A, Backfilhng & Grading Schedule, with revtsed exhibit.
<br />Volume Li, Tab 20 - Backfilling and Grading
<br />1. Text -replace existing Table 20-2, Pre- and Postmining Drainage Channel Summary, with
<br />revised page.
<br />2. Replace existing Exhibit 20-1A, New Five-Year Permit Area Disturbance Map, with new exhibit.
<br />3. Replace existing Exhibit 20-5.9, Postmining Channel Profiles, with revised exhibit.
<br />Volume 13, Tab 21- Minesoil Reconstruction
<br />1. Text -replace existing Table 21-2A, Annual Soil Salvage Volumes, with revised table.
<br />2. Text -replace existing Table 21-4A, Topsoil Salvage and Replacement Schedule, .vith revised
<br />table.
<br />3. Replace existing Exhibit 21-], Topsoil Replacement, with revised exhibit.
<br />Volume 13, Tab 22 - Revegetarion Plan
<br />1. Text -replace existing page 27 with re~~ised page
<br />2. Replace existing Exhibit 22-1A, Postmming Vegetation Map, with revised exhibit.
<br />Volume 14, Tab 25 - Bondine
<br />1. Text -replace existing pages9, 10 and I1 with revised pages.
<br />2. Attachment 25-1 Bond Cost Worksheet -replace existing pages 25-1-11 and 25-1-13 with
<br />revised pages.
<br />
|