My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV03916
DRMS
>
Back File Migration
>
Revision
>
REV03916
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:01:52 AM
Creation date
11/21/2007 9:13:26 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1994011
IBM Index Class Name
Revision
Doc Date
12/17/1997
Doc Name
WEST END PIT PN M-94-011 CONVERSTION 1 CN-01 PRELIMINARY RECLAMATION COST ESTIMATE
From
DMG
To
DOUG CONGER
Type & Sequence
CN1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Colorado Division of Minerals and Geology <br />_________________________________________ <br />ESTIMATING FORM - SCRAPER WORK <br />TASK N0. 11 PREP. BY: SSS PERMIT N0. M-94-011 <br />__________ ________ __________ <br />DATE 12/10/97 FILENAME: M011-11 MINE: Nest End Gravel Pit No. 1 <br />__________ ________ _______________________ <br />PERMIT ACTION Conversion No. 1 Application <br />____________________________________________________ <br />TASK DESCRIPTION Replace Topsoil on Stockpile/Processing Area <br />HOURLY EQUIPMENT COSTS: <br />______________________ Single, Double or Triple <br />County: MONTROSE Labor Zone 1 Shifts S <br />___________ ________ __________ <br />Equipment Descriptions <br />Scraper team make-up CAT 623E with ROPS cab <br />Road ma int. - Grader N/A <br />___________________________________________ <br />Scraper Team Road Maintenance <br />Scraper Dozers) Grader Water truck <br />Equi Anent Filename:623E-ROP N/A N/A <br />________ ________ _________ _________ <br />Utilization on job: 100X N/A N/A N/A <br />________ ________ _________ _________ <br />Cost Breakdown: <br />Ownership cost/h r: 538.24 N/A N/A <br />Operating cost/h r: 578.97 N/A N/A <br />Operator cost/hr: 523.13 N/A N/A <br />Unit subtotals: 8140.34 N/A N/p <br />________ <br />Scraper team subtotal ________ <br />5140.34 _________ <br />Maint. subtotal <br />Total Work Team Cost/Hr: 5140.34 <br />MATERIAL QUANTITIES: <br />___________________ <br />___________________ <br />Beg. <br />Volume: 9680 LCY <br />Lu.Yd. ---------- Swetl Loose <br />Volume: 9,680 LCY Factor: N/A Volume: <br />__________ __________ <br />Source of quantity take-off: Exhibit C - Mining Plan Map <br />_____________________________ <br />Source of est. swell factor: N/A <br />N/A <br />N/A <br />N/A <br />N/A <br />N/A <br />9,680 LCY <br />
The URL can be used to link to this page
Your browser does not support the video tag.