My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV03916
DRMS
>
Back File Migration
>
Revision
>
REV03916
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:01:52 AM
Creation date
11/21/2007 9:13:26 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1994011
IBM Index Class Name
Revision
Doc Date
12/17/1997
Doc Name
WEST END PIT PN M-94-011 CONVERSTION 1 CN-01 PRELIMINARY RECLAMATION COST ESTIMATE
From
DMG
To
DOUG CONGER
Type & Sequence
CN1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• i <br />Colorado Division of Minera Ls and Geology <br />ESTIMATING FORM - BULLD02ER RIPPING <br />___________________________________ <br />Task #: 5 Prep. by: SSS Task File Name• N011-8 <br />Date; 12/10/97 Permit #: X94-011 Mine: Yest End Gravel Pit No. 1 <br />Permit Action: Conversion No. 1 Application <br />Task Description: Rip North Centrl Unit Pit Floor <br />HOURLY EQUIPMENT COST <br />_____________________ Basic Machine: Cat D9N Horsepower: 370 <br />Blade Type: SEMI-UNIVERSAL ---------- <br />Attachment #1: ROPS Cab Shift Basis: 1/day <br />Attachment #2: 3-shank ripper ---------- <br />Cost/Hr Breakdown: Utilization X (code bsli) <br />----------------- ownership = 543.41 N/A <br />operating/overhaul - dozer = 574.86 100 <br />•ripper = 57.69 100 <br />operator = 522.95 N/A <br />Total egpt. unit Lost/hr = 5148.90 Total fleet cost/h r: 5148.90 <br />MATERIAL OUANT IT IES <br />___________________ Selected method :Area <br />Seismic Load Bank ------------- <br />methotl: N/A N/A Factor N/A Volume N/A BCY <br />Area __________- _____-- _____-_____ <br />method: 0.50 Acres Rip Depth: 1.50 Volume 1,210 BCY or CCY <br />Source of quantity take-off: Exhibit C - Mining PLan Map <br />Source of mat. load factor: N/A <br />HOURLY PRODUCTION <br />Seismic Method - Seismic velocity of material: N/A feet/sec. <br />-------------- - Unadjusted hourly production: N/A BCY or CCY/hr <br />Area Method - Avg. ripping depth per pass: 1.50 feet <br />----------- - Avg. ripping width per pass: 7.67 feet <br />- Avg. ripping length per pass: 200.00 feet <br />- Avg. velocity of machine 88.00 feet/min. <br />- Avg. machine maneuver time 0.25 minutes <br />- Nourly prod. per unit area 0.838 acres/hr <br />- Unadjusted hourly production: 2,026.91 BCY or CCT/hr <br />Correction Factors -Unadjusted production = 2,026.91 BCY or CCY/hr <br />--------------- --- -Site altitude = 5,800 feet <br /> - Altitude adjustment = 1.00 (Cat tbl) <br /> - Job efficiency factor = 0.83 (1sh/day) <br /> - Net correction = 0.83 multiplier <br /> - Adjusted production = 1682.33 BCY or CCY/hr <br /> - Fleet production = 1682.33 BCY or CCY/hr <br />JOB COST =_______ <br />Fleet Size 1 Dozers) Total Job Time: 0.72 Hours <br /> <br />Unit Cost -_______ <br />50.089 /CCY Total <br />Job Cost: ___________ <br />5107.10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.