Laserfiche WebLink
the guidelines for that classification. Otherwise, an educated guess based on past sales <br />at the other site should be used to predict an educated time frame. The Division does not <br />hold an operator to any time frames but must have a general idea of the timeframes in <br />question. Please correct Exhibit D, 6.4.4(e)(i)(ii)(iii). <br />8) Exhibit E does not meet the requirements of Rule 6.4.5. Please address all the <br />requirements of Rule 6.4.5(1), 2(b1, (c)(fl. <br />9) Exhibit F does not meet the requirements of Rule 6.4.6. The submitted map shows <br />current topography and not final expected appearance per Rule 6.4.8(a). Please submit <br />a map of sufficient scale and detail to show final topography and conditions after full <br />reclamation has been completed. <br />10)Please find enclosed a copy of the Office of State Engineer's comments concerning this <br />amendment. Please address those concerns directly to the OSE and Cc a copy to the <br />Division for the permit file. <br />11)Please clearly demonstrate that blasting will not adversely affect off-site areas per Rule <br />6.5(4). Due to the remoteness of the site. a simple statement clarifying the issue wiN be <br />sufficient to meet the requirements of the rules. <br />These reviewed issues do not imply that all other requirements are met. Further adequacy <br />review will be undertaken on this application as relevant information is supplied and analyzed. If <br />you need additional information, please contact me at the Division of Minerals and Geology, <br />Grand Junction Field Office, 101 S. 3rd St., Suite 301, Grand Junction, CO 81501, telephone <br />no. 970.241.1117. <br />Sincerely, <br />-~ 1~ <br />Russ Mean <br />Environmental Protection Specialist <br />