My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV03888
DRMS
>
Back File Migration
>
Revision
>
REV03888
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:01:50 AM
Creation date
11/21/2007 9:13:19 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981033
IBM Index Class Name
Revision
Doc Date
2/6/2004
Doc Name
Postponing The Inspection
From
DMG
To
Oxbow Mining, LLC
Type & Sequence
SL3
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Natural Resources <br />7 37 3 Sherman St., Room 215 C O 1. Q RA D O <br />Denver, Colorado 80203 D t V l 5 1 o N O F <br />Phone: (303) 866-3567 1~'t I N S RA L S <br />FAX: (303) 832-8106 <br />GEOLOGY <br />Februazy 6, 2004 REC LANATION•NINING <br />SAFETY•SCIENCE <br /> Bill Owens <br /> <br />Jim Kiger Governor <br /> <br />Oxbow Minin <br />LLC Russell George <br />g, <br />. Executive Director <br />3737 Highway 133 Ronald W. Canany <br />P.O. BOX 535 Division Director <br />Somerset, CO 81434 Natural Resource Trustee <br />RE: Beaz No. 3 Mine, Permit No. C-1981-033, Bear Coal Company <br />Phase One Bond Release Application No. 3, (SL-3) <br />Dear Mr. Kiger: <br />Bear Coai Company has applied for a Phase One bond release at the Bear No. 3 Mine. Oxbow Mining, <br />LLC is one of the surface owners of the disturbed area that has been proposed for Phase One release. <br />Due to the significant snow cover at the Beaz No. 3 Mine reclaimed azea, the Division is postponing <br />the Phase One bond release field inspection until late spring or eazly summer of 2004. Rule 3.03.2(2) <br />requires that a bond release field inspection be performed only when the reclamation work can be <br />properly evaluated by the Division. The Rule further states that there may be seasonal limitations on <br />the timing of the field inspection. This postponement is necessazy because the snow cover will prevent <br />a proper evaluation of the reclamation results. When the exact date of the bond release field inspection <br />has been set, you will be notified. <br />If you have questions or need additional information, please contact me. <br />Sincerely, <br />r' <br />osep J.1}ridash <br />Environmental Protection Specialist <br />cc: Daniel Beaz (Bear Coal Company) <br />William Bear (Bowie Resources) <br />Carl Johnston (Office of Surface Mining) <br />c:/word/beaz3/sl3postponelet3 <br />Office of Office of Colorado <br />Mined Land Reclamation Active and Inactive Mines Geological Survey <br />
The URL can be used to link to this page
Your browser does not support the video tag.