My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV03887
DRMS
>
Back File Migration
>
Revision
>
REV03887
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:01:50 AM
Creation date
11/21/2007 9:13:19 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977393
IBM Index Class Name
Revision
Doc Date
6/20/1995
Doc Name
REGULAR OPERATION RECLAMATION PERMIT APPLICATION PACKAGE
Type & Sequence
AM2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• -3- • <br />° The Colorado Historical Society regarding properties of historical <br />significance including the need for an archeological survey, procedures for <br />requesting a file search, and inventory forme to identify stn~etures; <br />° Colorado Division of Water Resources with regard to the administration of <br />water rights; <br />° Colorado Department of Health, Water Quality Control Division, with regard to <br />the discharge of pollutants into the waters of the State; <br />° Colorado Department of Health, Air Pollution Control Division, with regard to <br />the need for a fugitive dust permit; <br />° II.S. Bureau of Land-Management or the O.S. Forest Service for proposed <br />operations. on federal lands; <br />° D.S. Army Corps of Hngineers regarding a dredge and fill (404) permit; and <br />° The County Planning Department for the county or counties in which the <br />proposed operation is located. (Section 34-32-109(6), C.R.S. 1984, as <br />amended) requires a mining operator to be responsible for assuring that the <br />mining operation and the post-mining land use comply xith local land use <br />regulations and any master plan for extraction adopted pursu+int to Section <br />34-1-304.) <br />Permit Aonroval• <br />An applicant will not be issued a reclamation permit until notified by the Oi:fice that this <br />application and the required performance and financial warranties have )peen approved. <br />Alternatively, an automatic approval will occur where the Office fails to notify the <br />applicant/operator that the application has been denied. This decision must be made one <br />hundred twenty (120) calendar days from the date the application was submitted. However, <br />the performance and financial warranties must be submitted and approved by the Office <br />before the permit will be issued even if you receive an automatic approve;1. NO MINING <br />OPHRATIONS SHALL BHGIN DNTIL A PHRMIT IS ISSLTHD (Rule 4.1(2)). <br />Notice Reouirements: <br />within ten (10) days after filing, mail or personally serve a copy of the notice described <br />in Rule 1.6.2 (1) (c) to all owners of record of surface rights to the affected land and all <br />owners of record of lands that are within 200 feet of the boundary of the affected land <br />(Rule 1.6.2(1)(d)(i) and (ii)). In addition, you must publish four consecutive times in <br />a newspaper of general circulation, in the locality of the proposed mining operation, the <br />notice described in Rule 1.6.5. A copy of a form xhich includes all required information <br />for the notice has been attached for your use. You will need to provide the Office proof <br />of notice prior to the decision date. Proof of notice may be by submitting return receipts <br />of a certified mailing or by proof of personal service (Rules 1.4.1(4), 1.4 .2 (4)~(c) and <br />1.6.2 (1)(d)). <br />NOTE TO COMMHNTORS /OBJHCTORS: <br />It is likely there will be additions, changes, and deletions to this document prior to <br />final decision by the Office. Therefore, if you have any comments or concerns you must <br />contact the applicant or the Office prior to the decision date so that you will know what <br />changes may have been made to the application document. <br />The Office is not allowed to consider cosmente, unless they are written, and received prior <br />to the end of the public comment period. You should contact the applicant for the final <br />date of the public cosm~ent period. <br />If you have questions about the Mined Land Reclamation Board and Officer's review and <br />decision or appeals process, you may contact the Office at (303) 866-3567. <br />Completion of Mining: <br />Dpon completion of any phase of reclamation, you should consult Rule 3.1 for reclamation <br />standards and 4.16 for details on how to request a reclamation responsibility release from <br />the Board. <br />
The URL can be used to link to this page
Your browser does not support the video tag.