Laserfiche WebLink
III IIIIIIIIIIIIIIII <br />999 <br />STATE OF COLORADO <br />• ~ <br />OFFICE OF THE STATE ENGINEER <br />Division of Water Resources <br />Department of Natural Resources <br />1313 Sherman Street, Room 818 <br />Denver, Cobrado 80203 <br />Phone: (3031 866-3581 <br />FAX: 1303)866-3589 <br />RECEIVED <br />JAN 0 5 1001 <br />of cow <br />~~' b <br />„`' <br />o <br />.~~. <br />18'!6 ~ <br />http'//waterstate.co.us/defau It. htm <br />Division of Minerals and Geology <br />Response to Reclamation Permit Application Consideration <br />DATE: January 4, 2001 <br />Bill Owens <br />Governor <br />Greg E. Walther <br />Ececvlive Director <br />Hal D. Simpson, P.E. <br />Slate Engineer <br />TO: Carl B. Mount, Senior Environmental Protection Specialist <br />CC: Division 5 Office, District 38 Water Commissioner <br />FROM: Jeff Deatherage, P.E. ~-~ <br />RE: Conger Harvesting Area, File No <br />Operator: Gallegos Corporation, <br />Coniaci: William Balaz, Jr., 970.263.9733 <br />Section 28, Twp 11 South, Rng 88 West, 6th P.M., Gunnison County <br />CONDITIONS FOR APPROVAL <br />® The proposed operation does not anticipate exposing groundwater. Therefore, exposure of ground <br />water must not occur during or after mining operations. <br />^ The proposed operation will consume ground water by: ^ evaporation, ^ dust control, ^reclamation, <br />^ water removed in the mined product, ^ processing, ^ other:. <br />Prior to initiation of these uses of ground water, the applicant will need to obtain either a gravel pit or <br />other type of well permit, as applicable. However, prior to obtaining a permit, an approved water supply <br />plan or decreed plan for augmentation is required. <br />^ Prior to approving a well permit, the applicant must conduct a field inspection of the site and document <br />the locations of all wells within 600 feet of the permit area. The applicant must then obtain a waiver of <br />objection from all well owners with wells within 600 feet of the permit area or request a hearing before <br />the State Engineer. <br />^ In the event that ground water is encountered/used, water is currently available for appropriation at this <br />location, thus a well permit may be available without a water court approved plan for augmentation. <br />^ The proposed operation may have potential impact on existing water rights near the project location. <br />Applicant needs to demonstrate that the proposed project will not alter or impact the historic operation of <br />existing water rights. <br />^ The applicant has indicated plans to use other water for uses at the permit site. Applicant needs <br />to document that the water is obtained from a legal source for such industrial use. <br />^ Other: <br />COMMENTS: The applicant may contact the State Engineer's Office with any questions. <br />