My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-02-07_REVISION - M1999047
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1999047
>
2006-02-07_REVISION - M1999047
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 2:14:41 PM
Creation date
11/21/2007 9:11:36 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999047
IBM Index Class Name
Revision
Doc Date
2/7/2006
Doc Name
Option A- Recalculate FW
From
DMG
To
Adamson Brothers & Sons Feedlot
Type & Sequence
SO1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : QQ1 <br />Date : 02/072006 <br />User : TAS <br />Agency or organization name :Division O/Minerals 8 <br />Permit or other job action :Final Reclamation <br />Task description : Re-Spread 12,OOt7 <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D8R Sedes 11 - 8SU Horsepower : 310 <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 : NA <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership costlhour : $42.78 NA <br />Operating cost/haur : $66.09 100 <br />Ripper op.costlhour : $0.00 NA <br />Operator cosUhour : $31.78 NA <br />Total unitcast/hour : $140.66 Total fleet cost/hour : x140.66 <br />MATERIAL QUANTITIES -~ ~~ - ~~ <br />Initial Swell Loose <br />volume : 12,000 LCY factor : NA volume : 12,000 LCY <br /> <br />Source of estimated volume :permit <br />Source of estimated swell factor : NA <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br />Average push distance : 150 feet <br />Unadjusted hourly production : 634.3 LCY/hr <br />Material consistency description <br />Consolidated stockpile <br />Average push gradient : 2.00 % (i <br />Average site altitude : 5,000 feet <br />Matedal weight : 1,600 Ibs/LCY <br />Weight description <br />Top Soil <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) <br />Unit cost : $0.247 /LCY <br />State :Colorado <br />County :Yuma <br />Site :Adamson Brothers Pit <br />PermiUjob# : M-1999-047 <br />Abbreviation :none <br />Filename :M047-001 <br />Operator skill : 0.75 <br />Material consistency : 1.00 <br />Dozing method : 1.20 <br />Visibility : 1,00 <br />Job efficiency : 0.83 <br />Spoil pile : 0.80 <br />Push gradient : 1.05 <br />Altitude : 1.00 <br />Matedal weight : 1.44 <br />Blade type : 1.00 <br />Net correction : 0.90 <br />Adjusted unit production : 569.91 LCY/hr <br />Adjusted Fleet production : 569.91 LCY/hr <br />Total job time : 21.06 Hours <br />Total jab cost : x2,962 <br />
The URL can be used to link to this page
Your browser does not support the video tag.