Laserfiche WebLink
• Colorado Division of Minerals and Gear <br />_______________________________________ <br />ESTIMATING FORM - HULLDOZEA NORK <br />Task q: 2 Prep. by: CLK Task File Name: MOBS-2 <br />Date: 02/03/98 Perini[ q:M-B6~705 Mine: Loukonen Quarry <br />Permit Action: Bond Recalculation <br />Task Description: Spread topsoil over 1.5 acres <br />HOURLY EQUIPMENT COST <br />........ ............. Basic Machine: Ca[ DBN Horsepower: 285 <br />Blade Type: SEMI-UNIVERSAL '--'"'--' <br />~ Attachment ql: ROPS Cab Shift Basis: 1/day <br />Attachment q2: N/A '---'-'-" <br />Cost Breakdown: <br />-""""--"- Utilization t <br />Ownership cos[/hr 536.35 N/A <br />Operating fi overhaul cost/hr- dozer ° 552.25 100 <br />'r rPPer 50.00 N/A <br />Operator cost/hr • 522.95 N/A <br />Total egpt. unit cost/hr 5111.55 Total fleet cost/hr: 5223.10 <br />MATERIAL QUANTITLES <br />'Initial='• _' °'• Swell Loose <br />Volume: fi00.0 CCY Factor: 1.215 Volume: 729.0 LCY <br />Source of quantity take-oEf: Site/permit <br />Source of est. swe 11 Eactoz: Cat Handbook <br />HOURLY PRODUCTION <br />................. Job Condition Correction Factors <br />Avg. push distance: 200 ft. "---"-"---"--"--"'- --"" '- <br />' -"'-'-` Operator.......... 0. 75 (avg.) <br />Unadj usced hourly Mat. tone iscency.. 1. 00 (Cat tbll <br />dozer production: 448 LCY/hr Dozing method..... 1. 00 Igen.) <br />- "-"'-' Visibility........ 1. 00 lavg.l <br />Material consistency: Job efficiency.... 0. 87 (lsh/day) <br />Consolidated stockprle Spoil pile factor. 0. 90 feed-fc) <br />---"-`-"--"-"'--- '--"-" ---"-" Push gradient..... 1. 05 ICat cbll <br />Avg. push gradient: 2.00 k Inegl Altitude derat ion. 1. 00 (Cat tbll <br />' --`--" Material werght... 1. 44 (Cat Cb11 <br />Avg. Bite altitude: <br />_ 6500 <br />________ ft. Blade type........ <br />_________________________ 1 <br />_____ .00 <br />__ IS or UI <br />Material weight 1600.00 lb/LCY Net Jab Correction O. B9 <br />Mat. Descr.: ""--'-` `--- ~--- -" <br />Sop So 11 <br />____________________ <br />_________ <br />________ Adj usced Unit Prod.: <br />___ 7]7. <br />_____ 26 <br />___ LCY/hr <br /> Adjus ted Fleet Product ian: 754 .57 LCY/hr <br />JOB COST "- --"" -- <br />' '°Fle et size 2 Dozer (s) Total Job Time: 0 .97 Hours <br />Unit Cost 50.296 /LCY Total Job Cost: 5215 .55 <br />