My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV03777
DRMS
>
Back File Migration
>
Revision
>
REV03777
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:01:43 AM
Creation date
11/21/2007 9:11:32 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982055
IBM Index Class Name
Revision
Doc Date
4/26/1995
Doc Name
TR 18 CHECK DAMS REQUEST TO EXTEND DECISION DATE RATON CREEK MINE PN C-82-055
From
ENERGY FUELS MINING CO
To
DMG
Type & Sequence
TR18
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
iii iiiiiiiiiiiiiii <br />energy fuels mining company <br />one labor censer • swte 2500 <br />1200 seventeenth street • denver, Colorado 80202 <br />April 2l, 1995 <br />Ms. Janet H. Binns <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 <br />RE: Technical Revision No. 18 : Check Dams <br />Request to Extend Decision Date <br />Raton Creek Mine, Permit No. C-82-055 <br />Dear Janet: <br />~FC:EI~fF(1 <br />APR 2 6 1995 <br />~303~ 623-83t 7 <br />iwz 970931-2561 <br />DIVIS100 UI rvuuetai5 a ueulOrJy <br />As we recently discussed on the phone, Energy Fuels Mining Company (EFMC) is <br />proceeding with a new design approach for the azea involving the check dams at the Raton <br />Creek Mine. The new approach, which eliminates the existing catchment basins, will be <br />incorporated into the next submittal of responses for above referenced TR-18. The designs to <br />be submitted are intended to eliminate the issue of the catchment basins being impoundments, <br />and will reduce the existing steep inslopes that have been addressed as issues in the recent <br />Phase [bond release inspection. <br />The above design changes will require approximately one week to complete and submit. <br />Given this time and the time required for your review and approval, EFMC respectfully <br />requests an extension of the decision date for TR-18 to May 8, 1995. <br />Please contact me if you have any questions or concerns. <br />Sincerely, <br />Energy Fuels Mining Company <br />G2_ <br />Allen S. Weaver <br />Mine Engineer <br />cc: Randy Acre (EFMC) <br />
The URL can be used to link to this page
Your browser does not support the video tag.