Laserfiche WebLink
<br />RECLAMATION COST SUMMARY con['d sheet 4 of 4 <br />K. PORTAL/SHAFT SEALING <br />Task No.~ ______________ Task Dest ri ption I Cost (f) <br />n/a <br />L. DRILL HOLE/MONITORING WELL SEALING <br />Task No.~ Task Destri ption <br />n/a <br />M. MISCELLANEOUS RECLAMATION TASKS <br />Task No.~ Task Description <br />Subtotal (K): <br />Lost (S) <br />Subtotal (L ): <br />Cost (f) <br /> Demolition <br />5 ~ Seeding end other reveg tasks, 6 ac ~ f3,000 <br /> Fencing <br />b ~ Mob/Demob from Sam Luis, tractor 8 dozer ~ f880 <br /> Subtotal (M): 53,880 <br />TOTAL DIRECT RECLAMATION COSTS (subtotals A through M): 59,458 <br />II. INDIRE <br />__________ CT COSTS <br />_________________________________ <br />__________________ <br />___________ <br />___________________________________________ <br />A. CONTRACTOR'S OVERXEAD 8 PROFIT __________________ ___________ <br />Item No.l <br />~_ <br />~ Item Description <br />.__ <br />~~_____, ~ <br />_~____~~_ Lost (f) <br />~_______ <br />I <br />______ <br />I. ~ _________________ <br />._~____ <br />Public liability Insurance.... I_ <br />_____ <br />1.550% of dir. ~ ___ <br />5147 <br />2. ~ Contractor's Performance Bord 0.975% of dir. ~ f92 <br />3. ~ Contractor's Profit........... )0.00% of dir. ~ f946 <br />4. ~ Job Superintendent.. <br />Subtotal (A): f1, 185 <br />____________ <br />TOTAL CONSTRUCTION CONTRACT AMOUNT (direct plus 0 6 P): 510,643 <br />B. DMG PROJECT ADMINISTRATION EKPENSES <br />Item No.~ Item Description ~ Cost (f) <br />I. ~ Minerals Program Ao)ni n. Fee at S.OOX of cntr.~ 5532 <br />NET INDIRECT COST PERCENTAGE: 18.15% Subtotal (B): f532 <br />TOTAL INDIRECT RECLAMATION COSTS (subtotals A through B): (1,717 <br />TOTAL PERFORMANCE BOND AMOUNT (direct plus indirect costs): 577,775 <br />