Laserfiche WebLink
10.Response acceptable. <br />Exhibit D -Mine Plan <br />11.Response acceptable. <br />12.Response acceptable. <br />13.Thank you for submitting a seed mix proposed for stabilizing the topsoil and overburden <br />stockpiles. The proposed seed mix rate is excessive and would most likely lead to poor <br />success in vegetating these stockpiles. Please revise the seeding rate to approximately 15 <br />ponds of pure live seed per acre, rather than the proposed 50 pounds per acre. <br />14.Thank you for committing to maintain the unprocessed recycle concrete pile to a size of <br />30,000 tons or less. However, disposal of this material must be included in the reclamation <br />plan and cost estimate. Please revise the cost estimate accordingly. <br />15.Please revise the statement in the mining plan, committing to reporting hazardous material <br />spills, so the wording exactly duplicates that wording specified in the spill reporting <br />memorandum that was enclosed with the preliminary adequacy review. <br />16.Response acceptable. <br />Exhibit E -Reclamation Plan <br />17.Response acceptable. <br />18.Response acceptable. <br />19.Response acceptable. <br />20.Response acceptable. <br />21.Please revise the seeding rate for Sandberg blue grass from 0.01 to 0.10 pounds per acre.. <br />22. Response acceptable. <br />Exhibit F -Reclamation Plan Mao <br />23.Sheet 1 of 4 was revised so that the lines match up when matched to sheet 2 of 4, but <br />now sheet 2 of 4 does not match up to sheet 3 of 4. Please revise the maps as necessary <br />to ensure they all match-up to each other. <br />24.Response acceptable. <br />25.Response acceptable. <br />26.Response acceptable. <br />27.Response acceptable. <br />